Items where Subject is "Construction Management"
Up a level |
- Taxonomy (149)
- By Subject (149)
- Architecture, Planning & Surveying (149)
- Construction Management (149)
- Architecture, Planning & Surveying (149)
- By Subject (149)
3D
A conceptual framework for managing higher dimension knowledge in BIM environment. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 20. pp. 237-248. ISSN 2590-4140 (2020)
Accident
Safety performance of subcontractors in Malaysian construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 10. pp. 114-125. ISSN 2590-4140 (2020)
Space management’s regarding safety level at construction site. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 25-31. ISBN 978-967-5741-67-8 (2018)
Accident Costs Ratio
Accident cost ratio of bodily injury in railway construction projects. Malaysian Journal of Sustainable Environment (MySE), 5 (2). pp. 81-96. ISSN 0128-326X (2018)
Affordability
Sustainable housing affordability in Sabah. Journal of the Malaysian Institute of Planners, 5: 1. pp. 65-76. ISSN 1675-6215 (2016)
Air pollution
A study on environmental impact from construction operation in residential areas. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 603-608. ISBN 978-967-5741-67-8 (2018)
Airborne particulates matter
Inhalable and respirable dust concentration of soiled stone, metal and ceramic artefact inside national museum Malaysia. Journal of the Malaysian Institute of Planners, 16 (2): 30. pp. 293-303. ISSN 1675-6215 (2018)
Ambiguous provisions
Ambiguity extension of time provisions in standard forms of contract: an analysis of PAM 2018 contract. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 18. pp. 208-227. ISSN 2590-4140 (2020)
ArcGIS
Flood hazard mapping in Perlis, using [GIS] and analytical hierarchy process [AHP]. Degree thesis, Universiti Teknologi MARA Cawangan Perlis. (2018)
Archictecture
Manfaat nilai estetika, keunikan bangunan lama. [Newspaper] (2016)
Architechture
Architects urged to design exciting eco-tourism buildings in Sabah. [Newspaper] (2018)
Architects Act 1967
Architects want act reviewed encourage local participation. [Newspaper] (2020)
Architectural design
Arkitek tak semesti bina bangunan besar. Berita Harian. (2019)
Architecture
MyCESMM seragamkan kaedah ukur bahan. [Video] (2015)
Nang Rindok: bajet 2017- perumahan di Sarawak. [Video] (2016)
Projek sistem binaan berindustri – hasil inovasi 5 pensyarah PSMZA. [Video] (2019)
Rancangan Do-iT: potensi kerjaya industri binaan ABM. [Video] (2018)
Jom terokai monumen bersejarah di negara kita. [Newspaper] (2020)
Kesan ruang tidak kondusif. [Newspaper] (2020)
Architecture Sign and Symbol
Built form properties as sign and symbols of patron political ideology. Jurnal Kejuruteraan, 29 (2). pp. 87-96. ISSN 0128-0198 (2017)
Artefact
Inhalable and respirable dust concentration of soiled stone, metal and ceramic artefact inside national museum Malaysia. Journal of the Malaysian Institute of Planners, 16 (2): 30. pp. 293-303. ISSN 1675-6215 (2018)
Artificial Intelligence
Industrial Revolution 4.0 can help boost construction industry. [Newspaper] (2020)
Artificial intelligence
Technology awareness of artificial intelligence (AI) application for risk analysis in construction projects. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 16. pp. 182-195. ISSN 2590-4140 (2020)
Attributes
Historic Building Information Modelling (HBIM) for Malaysian construction industry. PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, 16 (3): 28. pp. 332-343. ISSN 0128-0945 (2018)
Audit projek kerajaan
Isu integriti dalam pelaksanaan projek-projek kerajaan daripada perspektif Jabatan Audit Negara. In: Program Transformasi Kepimpinan Juruukur/Jurugeospatial JUPEM Tahun 2020, 1 & 2 Februari 2020, Institut Tanah dan Ukur Negara (INSTUN). (Unpublished) (2020)
Awareness
Towards implementation of green technology in Sabah construction industry. Materials Science and Engineering, 291. ISSN 1757-899X (2017)
Awareness and compliance,
Compliance with the use of personal protective equipment (PPE) on construction sites in Johor, Malaysia. International Journal of Real Estate Studies, 14 (1): 12. pp. 123-138. ISSN 1823-8505 (2020)
BIM
Improving cost and time control in construction using Building Information Model (BIM): a review. Pertanika Journal Science & Technology, 26 (1): 2. 21 -36. ISSN 0128-7680 (2018)
BIM Execution Plan (BEP)
An exploratory study: building information modelling execution plan (BEP) procedure in mega construction projects. Malaysian Construction Research Journal (MCRJ), 18 (1): 2. pp. 29-40. ISSN 1985-3807 (2016)
Bahan binaan
Kos bahan binaan bangunan meningkat. [Newspaper] (2022)
Bandar Mentakab
Lubang tiba-tiba di bandar Mentakab. [Newspaper] (2021)
Bangunan anjung tinjau
Merdeka 118 dilengkapi pelbagai keistimewaan. [Newspaper] (2021)
Barriers
Key factors of BIM implementation for interior design firms in Malaysia. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 175-184. ISSN 2180-3242 (2020)
Batu laterit
Masjid kampung Belimbing Dalam mungkin antara tertua di Malaysia. [Newspaper] (2020)
Benefits
Historic Building Information Modelling (HBIM) for Malaysian construction industry. PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, 16 (3): 28. pp. 332-343. ISSN 0128-0945 (2018)
Sustainable procurement in construction – the way forward for malaysia. Jurnal Jabatan Kerja Raya Malaysia. pp. 21-28. (2013)
Big data analytics
Exploring the potential application of big data in the construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 19. pp. 228-236. ISSN 2590-4140 (2020)
Brightness
Influence of Lighting and Colour Usage In Higher Education, a Case Study Of an Architectural Studio. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Building
Essential features of SMM for M&E works in Malaysia. Berita QS, Iss. 2, 2018/2019, 2. pp. 11-12. (Unpublished) (2019)
MyCESMM seragamkan kaedah ukur bahan. [Video] (2015)
Manfaat nilai estetika, keunikan bangunan lama. [Newspaper] (2016)
Building Automation System (BAS)
Building Information Modelling (BIM) in building life cycle. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, Perak, pp. 434-439. ISBN 978-967-5741-67-8 (2018)
Building Characteristic
Rainwater Harvesting (RWH) installation for buildings: a systematic review and meta-analysis approach. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 89-108. ISSN 0128-326X (2019)
Building Construction
Rainwater Harvesting (RWH) installation for buildings: a systematic review and meta-analysis approach. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 89-108. ISSN 0128-326X (2019)
Perak heritage mosques: evaluating the defects of building elements. Malaysian Journal of Sustainable Environment (MySE), 4 (1). pp. 77-94. ISSN 0128-326X (2018)
Late and non-payments issues in the Malaysian construction industry: perspective of building material suppliers. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 39-56. ISSN 0128-326X
Building Defects
Exploration of cause contributing defect at high-rise residential building in Klang Valley: a literature review. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 103-108. ISBN 978-967-5741-67-8 (2018)
Building Information Modelling
Key factors of BIM implementation for interior design firms in Malaysia. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 175-184. ISSN 2180-3242 (2020)
The Readiness of Building Information Modeling (BIM) Application in Quantity Surveying Firm for Quality Improvement. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Building Information Modelling (BIM)
Client governing success criteria in Building Information Modelling (BIM)-based projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 64-76. ISSN 2180-3242 (2020)
An exploratory study: building information modelling execution plan (BEP) procedure in mega construction projects. Malaysian Construction Research Journal (MCRJ), 18 (1): 2. pp. 29-40. ISSN 1985-3807 (2016)
A conceptual framework for managing higher dimension knowledge in BIM environment. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 20. pp. 237-248. ISSN 2590-4140 (2020)
Building Information Modelling (BIM) in building life cycle. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, Perak, pp. 434-439. ISBN 978-967-5741-67-8 (2018)
Building Layout
Flat Layout Affecting Social Interaction. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Building conservation
Heritage building information modelling: the rise of quantity surveyors. Berita QS, Iss. 1, 2018/2019, 1. pp. 21-26. (Unpublished) (2018)
Building construction
Developing criteria and variables for evaluating the effects of vegetation on single-family houses. Built Environment Journal, 12 (2): 1. pp. 1-11. ISSN 1675-5022 (2015)
Building designs
Engaging people through lifestyle architecture. [Newspaper] (2020)
Building life cycle
Building Information Modelling (BIM) in building life cycle. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, Perak, pp. 434-439. ISBN 978-967-5741-67-8 (2018)
Building safety
Fire safety policy and procedure at government hospital: case study Hospital Raja Perempuan Zainab II. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 196-201. ISBN 978-967-5741-67-8 (2018)
Ensuring safety of our building. [Newspaper] (2021)
Building surveying
Nang Rindok: bajet 2017- perumahan di Sarawak. [Video] (2016)
Built Form
Built form properties as sign and symbols of patron political ideology. Jurnal Kejuruteraan, 29 (2). pp. 87-96. ISSN 0128-0198 (2017)
Bukit Fraser
Kekal ciri menarik dan bersejarah di Bukit Fraser. [Newspaper] (2021)
Business performance
Competitive strategy and performance of quantity surveying firms in Malaysia. Journal of Construction in Developing Countries, 19 (2). pp. 15-32. ISSN 2180-4222 (2014)
CIDB
Peralihan teknologi pembinaan era COVID-19. [Newspaper] (2020)
Challenges
Historic Building Information Modelling (HBIM) for Malaysian construction industry. PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, 16 (3): 28. pp. 332-343. ISSN 0128-0945 (2018)
Sustainable procurement in construction – the way forward for malaysia. Jurnal Jabatan Kerja Raya Malaysia. pp. 21-28. (2013)
Children
A study of road hazardsfaced by Malaysian school children using HIRARC. Malaysian Journal of Public Health Medicine, 18 (2). pp. 10-17. ISSN 2590-3829 (2018)
Claims
A survey of Malaysian consultants on construction claim problems. Built Environment Journal (BEJ), 11 (1): 1. pp. 1-9. ISSN 1675-5022 (2014)
Client
Client governing success criteria in Building Information Modelling (BIM)-based projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 64-76. ISSN 2180-3242 (2020)
Cloud-based
A conceptual framework for managing higher dimension knowledge in BIM environment. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 20. pp. 237-248. ISSN 2590-4140 (2020)
Competitive Advantage
Knowledge retention for sustaining competitive advantage in construction industry: a conceptual. Malaysian Construction Research Journal (MCRJ), 3 (1). pp. 10-17. ISSN 2590-4140 (2018)
Competitive strategy
Competitive strategy and performance of quantity surveying firms in Malaysia. Journal of Construction in Developing Countries, 19 (2). pp. 15-32. ISSN 2180-4222 (2014)
Competitiveness
Construction sector can power us towards high-income nation. [Newspaper] (2021)
Compliance
MyCESMM seragamkan kaedah ukur bahan. [Video] (2015)
Fire safety policy and procedure at government hospital: case study Hospital Raja Perempuan Zainab II. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 196-201. ISBN 978-967-5741-67-8 (2018)
Composite walling
An innovative Structural Insulated Panel (SIP): evaluation of durability properties and structural performance. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 456-461. ISBN 978-967-5741-67-8 (2018)
Computer Technology and Networking
Industrial Revolution 4.0 can help boost construction industry. [Newspaper] (2020)
Concrete
Arahan Penggunaan JKR 20601-0251-18: Specification For Precast Concrete Works. Manual. Jabatan Kerja Raya Malaysia, Kuala Lumpur. (2019)
Conservation
Properties of traditional clay roof tiles manufacture in Kelantan, Peninsular Malaysia. Built Environment Journal (BEJ, 11 (2): 2. pp. 17-34. ISSN 1675-5022 (2014)
Singgora tiles: perception of the community in Kota Bharu, Kelantan. Built Environment Journal (BEJ), 12 (1): 2. pp. 11-17. ISSN 1675-5022 (2015)
Arkitek tak semesti bina bangunan besar. Berita Harian. (2019)
Risk cost analysis in Malay heritage conservation project. Journal of the Malaysian Institute of Planners, 18 (2): 5. pp. 59-72. ISSN 1675-6215 (2020)
Construction
Mempercepatkan pelaksanaan projek pembangunan RMK9. In: Mesyuarat Majlis Tindakan Negara Bil 1/2009, 25 Jun 2009, Putrajaya. (Unpublished) (2009)
Projek sistem binaan berindustri – hasil inovasi 5 pensyarah PSMZA. [Video] (2019)
Addressing issues on quality in low-cost house construction in Selangor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 32-37. ISBN 978-967-5741-67-8 (2018)
A study on environmental impact from construction operation in residential areas. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 603-608. ISBN 978-967-5741-67-8 (2018)
Isu integriti dalam pelaksanaan projek-projek kerajaan daripada perspektif Jabatan Audit Negara. In: Program Transformasi Kepimpinan Juruukur/Jurugeospatial JUPEM Tahun 2020, 1 & 2 Februari 2020, Institut Tanah dan Ukur Negara (INSTUN). (Unpublished) (2020)
Construction related deaths and injuries alarming. [Newspaper] (2020)
A study on the readiness of Malaysian contractors towards trade liberalization. Malaysian Construction Research Journal (MCRJ), 18 (1): 1. pp. 1-27. ISSN 1985-3807 (2016)
Peralihan teknologi pembinaan era COVID-19. [Newspaper] (2020)
Control of variation orders in the construction of residential projects in Malaysia. Journal of the Malaysian Institute of Planners, 20 (2). pp. 14-21. ISSN 1675-6215 (2022)
Impact of design changes in construction project. Malaysian Journal of Sustainable Environment (MySE), 4 (1). pp. 1-18. ISSN 0128-326X (2018)
Performance of contractor: project delay. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 52-56. ISBN 978-967-5741-67-8 (2018)
Sustainable procurement in construction – the way forward for malaysia. Jurnal Jabatan Kerja Raya Malaysia. pp. 21-28. (2013)
Case studies on the safety management at construction site. Journal of Sustainability Science and Management, 9 (2): 8. pp. 90-108. ISSN 1823-8556 (2014)
Construction Claims
A survey of Malaysian consultants on construction claim problems. Built Environment Journal (BEJ), 11 (1): 1. pp. 1-9. ISSN 1675-5022 (2014)
Construction Industry
Collaboration initiative on green construction and sustainability through Industrialized Buildings Systems(IBS) in the Malaysian construction industry. International Journal of Sustainable Construction Engineering & Technology, 1 (1). pp. 119-127. ISSN 2180-3242 (2010)
Knowledge retention for sustaining competitive advantage in construction industry: a conceptual. Malaysian Construction Research Journal (MCRJ), 3 (1). pp. 10-17. ISSN 2590-4140 (2018)
Construction Project
Effects of the environmental, occupational safety and health regulations towards the successful completion of a project. Degree thesis, Universiti Teknologi MARA, Cawangan Pulau Pinang. (2007)
Construction Safety
HIRARC: a tool of safety improvement in the construction industry. In: 2nd INTERNATIONAL CONFERENCE ON BUILT ENVIRONMENT IN DEVELOPING COUNTRIES (ICBEDC 2008), 3rd - 4th December, 2008, Universiti Sains Malaysia, Penang, Malaysia. (Submitted) (2008)
Construction companies
Conceptualising risk culture on Enterprise Risk Management (ERM) implementation in construction companies. Built Environment Journal, 17 (1): 5. pp. 58-69. ISSN 1675-5022 (2020)
Construction contracts
Ambiguity extension of time provisions in standard forms of contract: an analysis of PAM 2018 contract. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 18. pp. 208-227. ISSN 2590-4140 (2020)
Critical analysis of “doctrine of privity” in Malaysian construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 9. pp. 103-113. ISSN 2590-4140 (2020)
Construction dispute
Assessing the Malaysian standard form of contract in relation to the current construction dispute and dispute resolution. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 13. pp. 151-161. ISSN 2590-4140 (2020)
Construction health and safety
Compliance with the use of personal protective equipment (PPE) on construction sites in Johor, Malaysia. International Journal of Real Estate Studies, 14 (1): 12. pp. 123-138. ISSN 1823-8505 (2020)
Construction industry
UNSPECIFIED, ed. Best practices on occupational safety and health in construction industry 2019. Department of Occupational Safety and Health, Putrajaya, Malaysia. ISBN 978-967-16706-2-0 (2019)
Essential features of SMM for M&E works in Malaysia. Berita QS, Iss. 2, 2018/2019, 2. pp. 11-12. (Unpublished) (2019)
Partnering for small-sized contractors in Malaysia. Malaysian Construction Research Journal (MCRJ), 18 (1): 4. pp. 59-69. ISSN 1985-3807 (2016)
Liabilities of designer towards variation cost in commercial buildings in Kuching, Sarawak. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 276-284. ISBN 978-967-5741-67-8 (2018)
Constraints in implementing qlassic for stratified housing. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 171-176. ISBN 978-967-5741-67-8 (2018)
Late and non-payments issues in the Malaysian construction industry: perspective of building material suppliers. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 39-56. ISSN 0128-326X
Towards implementation of green technology in Sabah construction industry. Materials Science and Engineering, 291. ISSN 1757-899X (2017)
Heritage building information modelling: the rise of quantity surveyors. Berita QS, Iss. 1, 2018/2019, 1. pp. 21-26. (Unpublished) (2018)
Exploring the potential application of big data in the construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 19. pp. 228-236. ISSN 2590-4140 (2020)
Critical analysis of “doctrine of privity” in Malaysian construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 9. pp. 103-113. ISSN 2590-4140 (2020)
Developing a holistic project time management framework utilizing fundamental Supply Chain Management (SCM) tools to overcome delay in Malaysian public sector building projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 31-41. ISSN 2180-3242 (2020)
Construction knowledge areas
Project performance framework: the role of knowledge management and information technology infrastructure. Asian Journal of Business and Accounting, 1 (2). pp. 39-64. ISSN 1985-4064 (2008)
Construction project
Overview of safety & health cost framework for the construction of rail infrastructure projects. Malaysian Journal of Sustainable Environment (MySE), 2 (1). pp. 101-119. ISSN 0128-326X (2017)
Factors affecting quality in Construction Project Life Cycle (CPLC). The International Journal of Integrated Engineering, 14 (1). pp. 322-355. ISSN 2229-838X (2022)
Construction project life cycle
Factors affecting quality in Construction Project Life Cycle (CPLC). The International Journal of Integrated Engineering, 14 (1). pp. 322-355. ISSN 2229-838X (2022)
Construction project performance
Project performance framework: the role of knowledge management and information technology infrastructure. Asian Journal of Business and Accounting, 1 (2). pp. 39-64. ISSN 1985-4064 (2008)
Construction projects
Technology awareness of artificial intelligence (AI) application for risk analysis in construction projects. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 16. pp. 182-195. ISSN 2590-4140 (2020)
Construction sector
Construction sector can power us towards high-income nation. [Newspaper] (2021)
Construction waste
Empirical Research Approach Of Construction Waste Quantification And Standard Tolerance For Stratified Residential Building Projects. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 47-64. ISSN 0128-326X (2017)
Construction works
Adopting standardization in construction environment: standard method of measurement (SMMs). Procedia - Social and Behavioral Sciences, 170. pp. 37-48. ISSN 1877-0428 (2015)
Consultants
Liabilities of designer towards variation cost in commercial buildings in Kuching, Sarawak. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 276-284. ISBN 978-967-5741-67-8 (2018)
Content analysis
Assessing the Malaysian standard form of contract in relation to the current construction dispute and dispute resolution. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 13. pp. 151-161. ISSN 2590-4140 (2020)
Contract management
Ambiguity extension of time provisions in standard forms of contract: an analysis of PAM 2018 contract. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 18. pp. 208-227. ISSN 2590-4140 (2020)
Contract prolongation
Ambiguity extension of time provisions in standard forms of contract: an analysis of PAM 2018 contract. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 18. pp. 208-227. ISSN 2590-4140 (2020)
Contractor
Kontraktor O&G jutawan berusia 33 tahun. [Newspaper] (2017)
Kontraktor bumiputera perlu berani rebut peluang projek - PKMM. [Newspaper] (2018)
SME Go. [Website]
Partnering for small-sized contractors in Malaysia. Malaysian Construction Research Journal (MCRJ), 18 (1): 4. pp. 59-69. ISSN 1985-3807 (2016)
A study on the readiness of Malaysian contractors towards trade liberalization. Malaysian Construction Research Journal (MCRJ), 18 (1): 1. pp. 1-27. ISSN 1985-3807 (2016)
Implications and strategies of safety management in high rise building construction to contractor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 7-12. ISBN 978-967-5741-67-8 (2018)
Contractors
Effects of the environmental, occupational safety and health regulations towards the successful completion of a project. Degree thesis, Universiti Teknologi MARA, Cawangan Pulau Pinang. (2007)
Control
Control of variation orders in the construction of residential projects in Malaysia. Journal of the Malaysian Institute of Planners, 20 (2). pp. 14-21. ISSN 1675-6215 (2022)
Cost
Exploring the potential application of big data in the construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 19. pp. 228-236. ISSN 2590-4140 (2020)
Kejuruteraan kos melestari kewangan, pembangunan. [Newspaper] (2020)
Cost control
Improving cost and time control in construction using Building Information Model (BIM): a review. Pertanika Journal Science & Technology, 26 (1): 2. 21 -36. ISSN 0128-7680 (2018)
Cost overrun
Impact of design changes in construction project. Malaysian Journal of Sustainable Environment (MySE), 4 (1). pp. 1-18. ISSN 0128-326X (2018)
Crime Prevention Through Environmental Design (CPTED)
UNSPECIFIED, ed. Reka Bentuk bandar Selamat: Panduan Pelaksanaan. Unit Khas NKRA Bandar Selamat, Kuala Lumpur. ISBN 9789675456176 (2010)
Critical path method (CPM)
Construction planning for the success of projects: a case study. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 412-419. ISBN 978-967-5741-67-8 (2018)
Cuaca buruk
Bekerja dalam cuaca buruk, majikan boleh diambil tindakan. [Newspaper] (2022)
DOSH
Guidelines on Occupational Safety and Health in Construction Industry (Management) 2017. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan, Kuala Lumpur. (2017)
Guidelines on occupational safety and health in tunnel construction. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan, Kuala Lumpur. (1998)
Guidelines on trenching for construction safety. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan. (2000)
Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)
Defects
Performance of contractor: project delay. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 52-56. ISBN 978-967-5741-67-8 (2018)
Managing factors influence defects on Industrialized Building System (IBS) components towards sustainability construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 177-183. ISBN 978-967-5741-67-8 (2018)
Delay
Developing a holistic project time management framework utilizing fundamental Supply Chain Management (SCM) tools to overcome delay in Malaysian public sector building projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 31-41. ISSN 2180-3242 (2020)
Performance of contractor: project delay. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 52-56. ISBN 978-967-5741-67-8 (2018)
Delay and cost overrun
Improving cost and time control in construction using Building Information Model (BIM): a review. Pertanika Journal Science & Technology, 26 (1): 2. 21 -36. ISSN 0128-7680 (2018)
Demolished Concrete
Recycled Concrete Aggregate for IBS Component. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Design
Architects urged to design exciting eco-tourism buildings in Sabah. [Newspaper] (2018)
Design changes
Impact of design changes in construction project. Malaysian Journal of Sustainable Environment (MySE), 4 (1). pp. 1-18. ISSN 0128-326X (2018)
Design technology
This East Malaysian house showcases beauty in the ordinary. [Newspaper] (2020)
Design works
Designers approach in managing legal design risks in Malaysia. Built Environment Journal (BEJ), 12 (1): 5. pp. 34-49. ISSN 1675-5022 (2015)
Developer
Most property developers to report weaker sales in 2019. [Newspaper] (2020)
Development
Challenges and control mechanism for development on highland and steep slope: the case of Klang Valley. Malaysian Construction Research Journal (MCRJ), 18 (1). pp. 41-58. ISSN 1985-3807 (2016)
Development plan
Malaysian development plan system: issues and problems, one decade after its reform (2001-2011). PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, XI. pp. 1-20. ISSN 0128-0945 (2013)
Digital economy
Join us in developing state’s digital economy, says CM. [Newspaper] (2020)
Digitalisasi industri pembinaan
Kementerian Kerja Raya ke arah digitalisasi industri pembinaan. [Newspaper] (2019)
Dispute resolution
Assessing the Malaysian standard form of contract in relation to the current construction dispute and dispute resolution. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 13. pp. 151-161. ISSN 2590-4140 (2020)
Doctrine of privity
Critical analysis of “doctrine of privity” in Malaysian construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 9. pp. 103-113. ISSN 2590-4140 (2020)
Drainage
Flood hazard mapping in Perlis, using [GIS] and analytical hierarchy process [AHP]. Degree thesis, Universiti Teknologi MARA Cawangan Perlis. (2018)
EIA
An overview of the challenges in Malaysian green construction. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)
Economic influence
Competitive strategy and performance of quantity surveying firms in Malaysia. Journal of Construction in Developing Countries, 19 (2). pp. 15-32. ISSN 2180-4222 (2014)
Economic life
Nang Rindok: bajet 2017- perumahan di Sarawak. [Video] (2016)
PropertyGuru reaches out to developers with TechCare. [Newspaper] (2020)
Arkitek tak semesti bina bangunan besar. Berita Harian. (2019)
Effects of Covid-19 on local property market. [Newspaper] (2020)
Architects want act reviewed encourage local participation. [Newspaper] (2020)
‘Weak property market until economy perks up’. [Newspaper] (2020)
Join us in developing state’s digital economy, says CM. [Newspaper] (2020)
Economy
Most property developers to report weaker sales in 2019. [Newspaper] (2020)
‘Weak property market until economy perks up’. [Newspaper] (2020)
Economy life
Architects urged to design exciting eco-tourism buildings in Sabah. [Newspaper] (2018)
Employee Well-Being
Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)
Energy usage
Building Information Modelling (BIM) in building life cycle. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, Perak, pp. 434-439. ISBN 978-967-5741-67-8 (2018)
Enterprise risk management (ERM)
Conceptualising risk culture on Enterprise Risk Management (ERM) implementation in construction companies. Built Environment Journal, 17 (1): 5. pp. 58-69. ISSN 1675-5022 (2020)
Environment
A study on environmental impact from construction operation in residential areas. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 603-608. ISBN 978-967-5741-67-8 (2018)
Engaging people through lifestyle architecture. [Newspaper] (2020)
Environmental Quality Act 1974
Effects of the environmental, occupational safety and health regulations towards the successful completion of a project. Degree thesis, Universiti Teknologi MARA, Cawangan Pulau Pinang. (2007)
Environmental sustainability
Empirical Research Approach Of Construction Waste Quantification And Standard Tolerance For Stratified Residential Building Projects. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 47-64. ISSN 0128-326X (2017)
Extension of time
Ambiguity extension of time provisions in standard forms of contract: an analysis of PAM 2018 contract. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 18. pp. 208-227. ISSN 2590-4140 (2020)
Extension of time and performance
Performance of contractor: project delay. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 52-56. ISBN 978-967-5741-67-8 (2018)
Factors
Exploration of cause contributing defect at high-rise residential building in Klang Valley: a literature review. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 103-108. ISBN 978-967-5741-67-8 (2018)
Factors Influence
Managing factors influence defects on Industrialized Building System (IBS) components towards sustainability construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 177-183. ISBN 978-967-5741-67-8 (2018)
Fakulti Rekabentuk dan Senibina
Kesan ruang tidak kondusif. [Newspaper] (2020)
Feasibility
A Feasibility Study on Rainwater Harvesting System for Mosque in Perak Tengah. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Field work
Kontraktor O&G jutawan berusia 33 tahun. [Newspaper] (2017)
Kontraktor bumiputera perlu berani rebut peluang projek - PKMM. [Newspaper] (2018)
Finance
SME Go. [Website]
Fire safety management
Fire safety policy and procedure at government hospital: case study Hospital Raja Perempuan Zainab II. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 196-201. ISBN 978-967-5741-67-8 (2018)
Firm competitiveness
Competitive strategy and performance of quantity surveying firms in Malaysia. Journal of Construction in Developing Countries, 19 (2). pp. 15-32. ISSN 2180-4222 (2014)
Flood
Flood hazard mapping in Perlis, using [GIS] and analytical hierarchy process [AHP]. Degree thesis, Universiti Teknologi MARA Cawangan Perlis. (2018)
Foamed concrete
An innovative Structural Insulated Panel (SIP): evaluation of durability properties and structural performance. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 456-461. ISBN 978-967-5741-67-8 (2018)
Foreign architects
Architects want act reviewed encourage local participation. [Newspaper] (2020)
GIS
Flood hazard mapping in Perlis, using [GIS] and analytical hierarchy process [AHP]. Degree thesis, Universiti Teknologi MARA Cawangan Perlis. (2018)
Gantt chart
Construction planning for the success of projects: a case study. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 412-419. ISBN 978-967-5741-67-8 (2018)
Garis panduan
UNSPECIFIED, ed. Garis panduan keselamatan dan kesihatan pekerjaan industri pembinaan (pengurusan) 2020. Jabatan Keselamatan Dan Kesihatan Pekerjaan, Putrajaya, Malaysia. ISBN 978-967-16706-7-5 (2020)
Gazebo
Serambi Villa kediaman impian tepi tasik. [Newspaper] (2021)
Governance
Client governing success criteria in Building Information Modelling (BIM)-based projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 64-76. ISSN 2180-3242 (2020)
Green Building Index (GBI)
An overview of the challenges in Malaysian green construction. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)
Green Construction
Project manager success factors in managing green buildings in Malaysia: knowledge and skills. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)
An overview of the challenges in Malaysian green construction. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)
Green Technology
A Feasibility Study on Rainwater Harvesting System for Mosque in Perak Tengah. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Green approach
Green approach in road construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 102-107. ISBN 978-967-5741-67-8 (2015)
Green architecture
Green approach in road construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 102-107. ISBN 978-967-5741-67-8 (2015)
Towards implementation of green technology in Sabah construction industry. Materials Science and Engineering, 291. ISSN 1757-899X (2017)
Green construction
Collaboration initiative on green construction and sustainability through Industrialized Buildings Systems(IBS) in the Malaysian construction industry. International Journal of Sustainable Construction Engineering & Technology, 1 (1). pp. 119-127. ISSN 2180-3242 (2010)
Green roof
Analytical review of maintenance criteria for green roof in Malaysia. Malaysian Journal of Sustainable Environment (MySE), 3 (2): 2. pp. 31-45. ISSN 0128-326X (2017)
Green technology
Towards implementation of green technology in Sabah construction industry. Materials Science and Engineering, 291. ISSN 1757-899X (2017)
Gross Domestic Product (GDP)
Construction sector can power us towards high-income nation. [Newspaper] (2021)
Haily
Haily sasar hasil IPO RM20.4 juta. [Newspaper] (2021)
Hazard
A study of road hazardsfaced by Malaysian school children using HIRARC. Malaysian Journal of Public Health Medicine, 18 (2). pp. 10-17. ISSN 2590-3829 (2018)
Hazard identification
A study of road hazardsfaced by Malaysian school children using HIRARC. Malaysian Journal of Public Health Medicine, 18 (2). pp. 10-17. ISSN 2590-3829 (2018)
Health
UNSPECIFIED, ed. Best practices on occupational safety and health in construction industry 2019. Department of Occupational Safety and Health, Putrajaya, Malaysia. ISBN 978-967-16706-2-0 (2019)
Heritage building conservation
Heritage building information modelling: the rise of quantity surveyors. Berita QS, Iss. 1, 2018/2019, 1. pp. 21-26. (Unpublished) (2018)
Heritage project
Risk cost analysis in Malay heritage conservation project. Journal of the Malaysian Institute of Planners, 18 (2): 5. pp. 59-72. ISSN 1675-6215 (2020)
High rise building
Implications and strategies of safety management in high rise building construction to contractor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 7-12. ISBN 978-967-5741-67-8 (2018)
Higher dimension knowledge
A conceptual framework for managing higher dimension knowledge in BIM environment. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 20. pp. 237-248. ISSN 2590-4140 (2020)
Highland
Challenges and control mechanism for development on highland and steep slope: the case of Klang Valley. Malaysian Construction Research Journal (MCRJ), 18 (1). pp. 41-58. ISSN 1985-3807 (2016)
Hillside development project
The implementation of risk management plan: towards safer hillside development project. Malaysian Construction Research Journal (MCRJ): International Conference on Applied Science and Technology (ICAST) 2017, 3 (1): 1. pp. 1-9. ISSN 1985-3807 (2018)
Hilly Area
The implementation of risk management plan: towards safer hillside development project. Malaysian Construction Research Journal (MCRJ): International Conference on Applied Science and Technology (ICAST) 2017, 3 (1): 1. pp. 1-9. ISSN 1985-3807 (2018)
Historic Building Information Modelling
Historic Building Information Modelling (HBIM) for Malaysian construction industry. PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, 16 (3): 28. pp. 332-343. ISSN 0128-0945 (2018)
Holdings
Pencakar Langit. [Newspaper] (2017)
Housing
Constraints in implementing qlassic for stratified housing. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 171-176. ISBN 978-967-5741-67-8 (2018)
Sustainable housing affordability in Sabah. Journal of the Malaysian Institute of Planners, 5: 1. pp. 65-76. ISSN 1675-6215 (2016)
Housing quality
Addressing issues on quality in low-cost house construction in Selangor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 32-37. ISBN 978-967-5741-67-8 (2018)
IBS
Peralihan teknologi pembinaan era COVID-19. [Newspaper] (2020)
IR 4.0
Pertingkat aspek OSH selaras tuntutan IR4.0. [Newspaper] (2020)
Implementation
Towards implementation of green technology in Sabah construction industry. Materials Science and Engineering, 291. ISSN 1757-899X (2017)
Implementation and management
Building Information Modelling (BIM) in building life cycle. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, Perak, pp. 434-439. ISBN 978-967-5741-67-8 (2018)
Industrialised Building System (IBS)
Managing factors influence defects on Industrialized Building System (IBS) components towards sustainability construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 177-183. ISBN 978-967-5741-67-8 (2018)
Industrialised building system (IBS)
Projek sistem binaan berindustri – hasil inovasi 5 pensyarah PSMZA. [Video] (2019)
Industrialized Building System (IBS)
Collaboration initiative on green construction and sustainability through Industrialized Buildings Systems(IBS) in the Malaysian construction industry. International Journal of Sustainable Construction Engineering & Technology, 1 (1). pp. 119-127. ISSN 2180-3242 (2010)
Industry Requirement
Construction management graduates roles and tasks portfolio: analysing using rasch measurement model. Malaysian Construction Research Journal (MCRJ): International Conference on Applied Science and Technology (ICAST) 2017, 3 (1). pp. 18-24. ISSN 2590-4140 (2018)
Information Technology
Industrial Revolution 4.0 can help boost construction industry. [Newspaper] (2020)
Information technology infrastructure
Project performance framework: the role of knowledge management and information technology infrastructure. Asian Journal of Business and Accounting, 1 (2). pp. 39-64. ISSN 1985-4064 (2008)
Innovation
Kementerian Kerja Raya ke arah digitalisasi industri pembinaan. [Newspaper] (2019)
Insentif
SME Go. [Website]
Integrity
Isu integriti dalam pelaksanaan projek-projek kerajaan daripada perspektif Jabatan Audit Negara. In: Program Transformasi Kepimpinan Juruukur/Jurugeospatial JUPEM Tahun 2020, 1 & 2 Februari 2020, Institut Tanah dan Ukur Negara (INSTUN). (Unpublished) (2020)
Intelligent Systems
Industrial Revolution 4.0 can help boost construction industry. [Newspaper] (2020)
Interior design
Key factors of BIM implementation for interior design firms in Malaysia. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 175-184. ISSN 2180-3242 (2020)
Internet of Things (IoT)
Industrial Revolution 4.0 can help boost construction industry. [Newspaper] (2020)
Jaringan Pengangkutan Awam
Projek dalam fasa 'bersedia'. [Newspaper] (2020)
Kaedah komunikasi
Pengurusan projek pembinaan: kaedah dan keberkesanan komunikasi di tapak bina. In: Management in Construction Research Conference (MICRA), June 2009, USM, Penang. (2009)
Kawasan strategik
Merdeka 118 dilengkapi pelbagai keistimewaan. [Newspaper] (2021)
Kebajikan
UNSPECIFIED, ed. Garis panduan keselamatan dan kesihatan pekerjaan industri pembinaan (pengurusan) 2020. Jabatan Keselamatan Dan Kesihatan Pekerjaan, Putrajaya, Malaysia. ISBN 978-967-16706-7-5 (2020)
Keberkesanan komunikasi
Pengurusan projek pembinaan: kaedah dan keberkesanan komunikasi di tapak bina. In: Management in Construction Research Conference (MICRA), June 2009, USM, Penang. (2009)
Kejuruteraan Kos
Kejuruteraan kos melestari kewangan, pembangunan. [Newspaper] (2020)
Kejuruteraan awam
Haily sasar hasil IPO RM20.4 juta. [Newspaper] (2021)
Kepakaran pembinaan
Pasukan petugas diwujudkan selesai projek perumahan sakit - KPKT. [Newspaper] (2022)
Kesan alam sekitar
Henti amalan bina bangunan tanpa kelulusan PBT. [Newspaper] (2022)
Keselamatan
UNSPECIFIED, ed. Garis panduan keselamatan dan kesihatan pekerjaan industri pembinaan (pengurusan) 2020. Jabatan Keselamatan Dan Kesihatan Pekerjaan, Putrajaya, Malaysia. ISBN 978-967-16706-7-5 (2020)
Keselamatan awam
Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)
Keselamatan pekerja
Bekerja dalam cuaca buruk, majikan boleh diambil tindakan. [Newspaper] (2022)
Kesihatan
UNSPECIFIED, ed. Garis panduan keselamatan dan kesihatan pekerjaan industri pembinaan (pengurusan) 2020. Jabatan Keselamatan Dan Kesihatan Pekerjaan, Putrajaya, Malaysia. ISBN 978-967-16706-7-5 (2020)
Kesihatan pekerjaan
Bekerja dalam cuaca buruk, majikan boleh diambil tindakan. [Newspaper] (2022)
Key factors
Key factors of BIM implementation for interior design firms in Malaysia. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 175-184. ISSN 2180-3242 (2020)
Knowledge
Project manager success factors in managing green buildings in Malaysia: knowledge and skills. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)
Knowledge management
Project performance framework: the role of knowledge management and information technology infrastructure. Asian Journal of Business and Accounting, 1 (2). pp. 39-64. ISSN 1985-4064 (2008)
Komunikasi
Pengurusan projek pembinaan: kaedah dan keberkesanan komunikasi di tapak bina. In: Management in Construction Research Conference (MICRA), June 2009, USM, Penang. (2009)
Kontraktor kelas A
Kontraktor O&G jutawan berusia 33 tahun. [Newspaper] (2017)
Kos pembinaan
Kos bahan binaan bangunan meningkat. [Newspaper] (2022)
Kualiti binaan
LBS dinobat 10 pemaju terbaik. [Newspaper] (2021)
Labour force
Rancangan Do-iT: potensi kerjaya industri binaan ABM. [Video] (2018)
Landscape
Jom terokai monumen bersejarah di negara kita. [Newspaper] (2020)
This East Malaysian house showcases beauty in the ordinary. [Newspaper] (2020)
Late payments
Late and non-payments issues in the Malaysian construction industry: perspective of building material suppliers. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 39-56. ISSN 0128-326X
Legal
Designers approach in managing legal design risks in Malaysia. Built Environment Journal (BEJ), 12 (1): 5. pp. 34-49. ISSN 1675-5022 (2015)
Legislation
Fire safety policy and procedure at government hospital: case study Hospital Raja Perempuan Zainab II. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 196-201. ISBN 978-967-5741-67-8 (2018)
Liability
Liabilities of designer towards variation cost in commercial buildings in Kuching, Sarawak. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 276-284. ISBN 978-967-5741-67-8 (2018)
Kejuruteraan kos melestari kewangan, pembangunan. [Newspaper] (2020)
Liberalization
A study on the readiness of Malaysian contractors towards trade liberalization. Malaysian Construction Research Journal (MCRJ), 18 (1): 1. pp. 1-27. ISSN 1985-3807 (2016)
Lifestyle architecture
Engaging people through lifestyle architecture. [Newspaper] (2020)
Location of Bodily Injury
Accident cost ratio of bodily injury in railway construction projects. Malaysian Journal of Sustainable Environment (MySE), 5 (2). pp. 81-96. ISSN 0128-326X (2018)
Low Cost Flats
Flat Layout Affecting Social Interaction. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Low cost house
Addressing issues on quality in low-cost house construction in Selangor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 32-37. ISBN 978-967-5741-67-8 (2018)
Low-carbon blueprint
Groundwork to build a smart city. [Newspaper] (2020)
Magnesium oxide
An innovative Structural Insulated Panel (SIP): evaluation of durability properties and structural performance. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 456-461. ISBN 978-967-5741-67-8 (2018)
Maintenance
Analytical review of maintenance criteria for green roof in Malaysia. Malaysian Journal of Sustainable Environment (MySE), 3 (2): 2. pp. 31-45. ISSN 0128-326X (2017)
Malay House
Properties of traditional clay roof tiles manufacture in Kelantan, Peninsular Malaysia. Built Environment Journal (BEJ, 11 (2): 2. pp. 17-34. ISSN 1675-5022 (2014)
Malay settlement
The orientation setting of buildings in the traditional Malay settlement: a case study of Kg Seri Tanjung, Sungai Udang, Melaka. Journal of the Malaysian Institute of Planners, 18 (2): 15. pp. 170-180. ISSN 1675-6215 (2020)
Malaysia
Client governing success criteria in Building Information Modelling (BIM)-based projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 64-76. ISSN 2180-3242 (2020)
Collaboration initiative on green construction and sustainability through Industrialized Buildings Systems(IBS) in the Malaysian construction industry. International Journal of Sustainable Construction Engineering & Technology, 1 (1). pp. 119-127. ISSN 2180-3242 (2010)
Malaysia bus crash
STAMP-Based analysis on the safety management system of bus operators. Journal of the Society of Automotive Engineers Malaysia, 3 (4). pp. 76-84. ISSN 2600-8092 (2019)
Malaysian Construction Industry
Construction management graduates roles and tasks portfolio: analysing using rasch measurement model. Malaysian Construction Research Journal (MCRJ): International Conference on Applied Science and Technology (ICAST) 2017, 3 (1). pp. 18-24. ISSN 2590-4140 (2018)
Malaysian construction
Competitive strategy and performance of quantity surveying firms in Malaysia. Journal of Construction in Developing Countries, 19 (2). pp. 15-32. ISSN 2180-4222 (2014)
Malaysian construction project
Developing a holistic project time management framework utilizing fundamental Supply Chain Management (SCM) tools to overcome delay in Malaysian public sector building projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 31-41. ISSN 2180-3242 (2020)
Malaysian standard form of contract
Assessing the Malaysian standard form of contract in relation to the current construction dispute and dispute resolution. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 13. pp. 151-161. ISSN 2590-4140 (2020)
Management
Case studies on the safety management at construction site. Journal of Sustainability Science and Management, 9 (2): 8. pp. 90-108. ISSN 1823-8556 (2014)
Marketability factor
Most property developers to report weaker sales in 2019. [Newspaper] (2020)
Masjid
Perkampungan al-Quran di Putrajaya. [Newspaper] (2020)
Material
Masjid kampung Belimbing Dalam mungkin antara tertua di Malaysia. [Newspaper] (2020)
Material Culture
Built form properties as sign and symbols of patron political ideology. Jurnal Kejuruteraan, 29 (2). pp. 87-96. ISSN 0128-0198 (2017)
Materials suppliers
Late and non-payments issues in the Malaysian construction industry: perspective of building material suppliers. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 39-56. ISSN 0128-326X
Measurement of building
Malaysian Standard Method of measurement of building works. Manual. The Institutions of Surveyors, Petaling Jaya. (Unpublished) (2000)
Mega projects
An exploratory study: building information modelling execution plan (BEP) procedure in mega construction projects. Malaysian Construction Research Journal (MCRJ), 18 (1): 2. pp. 29-40. ISSN 1985-3807 (2016)
Menara Merdeka 118
Merdeka 118 dilengkapi pelbagai keistimewaan. [Newspaper] (2021)
Mercu tanda
Merdeka 118 dilengkapi pelbagai keistimewaan. [Newspaper] (2021)
Mitigation
Flood hazard mapping in Perlis, using [GIS] and analytical hierarchy process [AHP]. Degree thesis, Universiti Teknologi MARA Cawangan Perlis. (2018)
OSH ICOP
STAMP-Based analysis on the safety management system of bus operators. Journal of the Society of Automotive Engineers Malaysia, 3 (4). pp. 76-84. ISSN 2600-8092 (2019)
OSHA
AWANI Pagi: isu keselamatan & kesihatan di tempat kerja. [Video] (2019)
Bekerja dalam cuaca buruk, majikan boleh diambil tindakan. [Newspaper] (2022)
Keselamatan tapak pembinaan: Zahrim Osman. [Video] (2014)
New concept to prevent workplace accidents, diseases. [Newspaper] (2019)
SPM 2017: keselamatan dan kesihatan pekerjaan kebangsaan. [Video] (2017)
Factory fined RM30k for unsafe worksite that resulted in visitor’s death. [Newspaper] (2020)
Construction related deaths and injuries alarming. [Newspaper] (2020)
Pertingkat aspek OSH selaras tuntutan IR4.0. [Newspaper] (2020)
Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)
Occupational
UNSPECIFIED, ed. Best practices on occupational safety and health in construction industry 2019. Department of Occupational Safety and Health, Putrajaya, Malaysia. ISBN 978-967-16706-2-0 (2019)
Online sales platforms
PropertyGuru reaches out to developers with TechCare. [Newspaper] (2020)
Opinion of value
Pencakar Langit. [Newspaper] (2017)
Kejuruteraan kos melestari kewangan, pembangunan. [Newspaper] (2020)
Organisasi projek
Pengurusan projek (project management). In: Mesyuarat Pemantapan Urusan Pentadbiran Kontrak Kerja Bersama Pegawai Penguasa Projek, February 2020, Melaka, Malaysia. (Submitted) (2020)
Orientation pattern
The orientation setting of buildings in the traditional Malay settlement: a case study of Kg Seri Tanjung, Sungai Udang, Melaka. Journal of the Malaysian Institute of Planners, 18 (2): 15. pp. 170-180. ISSN 1675-6215 (2020)
Outdoor Spaces
Flat Layout Affecting Social Interaction. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
PPE
Compliance with the use of personal protective equipment (PPE) on construction sites in Johor, Malaysia. International Journal of Real Estate Studies, 14 (1): 12. pp. 123-138. ISSN 1823-8505 (2020)
Partnering
Partnering for small-sized contractors in Malaysia. Malaysian Construction Research Journal (MCRJ), 18 (1): 4. pp. 59-69. ISSN 1985-3807 (2016)
Pasang siap
Kajian terhadap kriteria rekabentuk blok saling kunci dengan pendekatan perindustrian, fleksibel dan nyah-pasang. Jurnal Kejuruteraan, 30 (1). pp. 55-63. ISSN 0128-0198 (2018)
Pasaran ACE Bursa Malaysia
Haily sasar hasil IPO RM20.4 juta. [Newspaper] (2021)
Pelan Landskap
UNSPECIFIED, ed. Reka Bentuk bandar Selamat: Panduan Pelaksanaan. Unit Khas NKRA Bandar Selamat, Kuala Lumpur. ISBN 9789675456176 (2010)
Pemandangan tropika
Serambi Villa kediaman impian tepi tasik. [Newspaper] (2021)
Pembangunan berdaya tahan iklim
Henti amalan bina bangunan tanpa kelulusan PBT. [Newspaper] (2022)
Pembangunan hotel
Kekal ciri menarik dan bersejarah di Bukit Fraser. [Newspaper] (2021)
Pembinaan
UNSPECIFIED, ed. Garis panduan keselamatan dan kesihatan pekerjaan industri pembinaan (pengurusan) 2020. Jabatan Keselamatan Dan Kesihatan Pekerjaan, Putrajaya, Malaysia. ISBN 978-967-16706-7-5 (2020)
Pembinaan masjid
Menjejak keunikan seni bina masjid di Melaka. [Newspaper] (2021)
Pengurusan
Pengurusan projek pembinaan: kaedah dan keberkesanan komunikasi di tapak bina. In: Management in Construction Research Conference (MICRA), June 2009, USM, Penang. (2009)
Pengurusan projek
Pengurusan projek (project management). In: Mesyuarat Pemantapan Urusan Pentadbiran Kontrak Kerja Bersama Pegawai Penguasa Projek, February 2020, Melaka, Malaysia. (Submitted) (2020)
Pentadbiran sumber manusia
Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)
Penyesuaian iklim
Henti amalan bina bangunan tanpa kelulusan PBT. [Newspaper] (2022)
Perabot
Perabot asrama antivandalisme. [Newspaper] (2019)
Perancangan Bandar dan Wilayah
Projek dalam fasa 'bersedia'. [Newspaper] (2020)
Perkampungan al-quran
Perkampungan al-Quran di Putrajaya. [Newspaper] (2020)
Perlaksanaan
Pengurusan projek (project management). In: Mesyuarat Pemantapan Urusan Pentadbiran Kontrak Kerja Bersama Pegawai Penguasa Projek, February 2020, Melaka, Malaysia. (Submitted) (2020)
Persatuan Arkitek Perunding Malaysia (ACAM)
Henti amalan bina bangunan tanpa kelulusan PBT. [Newspaper] (2022)
Persekitaran pekerjaan
Bekerja dalam cuaca buruk, majikan boleh diambil tindakan. [Newspaper] (2022)
Perumahan lestari
LBS dinobat 10 pemaju terbaik. [Newspaper] (2021)
Place of work
Hanya 100 pantau 14,000 tapak projek. [Newspaper] (2019)
Planning
Construction planning for the success of projects: a case study. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 412-419. ISBN 978-967-5741-67-8 (2018)
Planning reform
Malaysian development plan system: issues and problems, one decade after its reform (2001-2011). PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, XI. pp. 1-20. ISSN 0128-0945 (2013)
Planning system
Malaysian development plan system: issues and problems, one decade after its reform (2001-2011). PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, XI. pp. 1-20. ISSN 0128-0945 (2013)
Planning tools
Construction planning for the success of projects: a case study. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 412-419. ISBN 978-967-5741-67-8 (2018)
Policy and procedure
Fire safety policy and procedure at government hospital: case study Hospital Raja Perempuan Zainab II. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 196-201. ISBN 978-967-5741-67-8 (2018)
Politics and Architecture
Built form properties as sign and symbols of patron political ideology. Jurnal Kejuruteraan, 29 (2). pp. 87-96. ISSN 0128-0198 (2017)
Process
Sustainable procurement in construction – the way forward for malaysia. Jurnal Jabatan Kerja Raya Malaysia. pp. 21-28. (2013)
Profession
Rancangan Do-iT: potensi kerjaya industri binaan ABM. [Video] (2018)
Professional architect
Suruhanjaya Juru Ukur Bahan perlu memperkukuh kemahiran pembinaan utama. [Video] (2018)
Profitability
Most property developers to report weaker sales in 2019. [Newspaper] (2020)
Project
Mempercepatkan pelaksanaan projek pembangunan RMK9. In: Mesyuarat Majlis Tindakan Negara Bil 1/2009, 25 Jun 2009, Putrajaya. (Unpublished) (2009)
Isu integriti dalam pelaksanaan projek-projek kerajaan daripada perspektif Jabatan Audit Negara. In: Program Transformasi Kepimpinan Juruukur/Jurugeospatial JUPEM Tahun 2020, 1 & 2 Februari 2020, Institut Tanah dan Ukur Negara (INSTUN). (Unpublished) (2020)
Project Management
HIRARC: a tool of safety improvement in the construction industry. In: 2nd INTERNATIONAL CONFERENCE ON BUILT ENVIRONMENT IN DEVELOPING COUNTRIES (ICBEDC 2008), 3rd - 4th December, 2008, Universiti Sains Malaysia, Penang, Malaysia. (Submitted) (2008)
Project Manager
Project manager success factors in managing green buildings in Malaysia: knowledge and skills. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)
Project contract
Kontraktor bumiputera perlu berani rebut peluang projek - PKMM. [Newspaper] (2018)
Project performance
Impact of design changes in construction project. Malaysian Journal of Sustainable Environment (MySE), 4 (1). pp. 1-18. ISSN 0128-326X (2018)
Projek
Pengurusan projek pembinaan: kaedah dan keberkesanan komunikasi di tapak bina. In: Management in Construction Research Conference (MICRA), June 2009, USM, Penang. (2009)
Projek bermasalah
Pasukan petugas diwujudkan selesai projek perumahan sakit - KPKT. [Newspaper] (2022)
Projek perumahan
Pasukan petugas diwujudkan selesai projek perumahan sakit - KPKT. [Newspaper] (2022)
Property
‘Weak property market until economy perks up’. [Newspaper] (2020)
Property Development
Nang Rindok: bajet 2017- perumahan di Sarawak. [Video] (2016)
Most property developers to report weaker sales in 2019. [Newspaper] (2020)
Property developers and agents
PropertyGuru reaches out to developers with TechCare. [Newspaper] (2020)
Property management
Effects of Covid-19 on local property market. [Newspaper] (2020)
Putrajaya
Perkampungan al-Quran di Putrajaya. [Newspaper] (2020)
QLASSIC
Constraints in implementing qlassic for stratified housing. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 171-176. ISBN 978-967-5741-67-8 (2018)
Quality
Addressing issues on quality in low-cost house construction in Selangor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 32-37. ISBN 978-967-5741-67-8 (2018)
Factors affecting quality in Construction Project Life Cycle (CPLC). The International Journal of Integrated Engineering, 14 (1). pp. 322-355. ISSN 2229-838X (2022)
Quality Improvement
The Readiness of Building Information Modeling (BIM) Application in Quantity Surveying Firm for Quality Improvement. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Quality performance
Constraints in implementing qlassic for stratified housing. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 171-176. ISBN 978-967-5741-67-8 (2018)
Quantity Surveying Firm
The Readiness of Building Information Modeling (BIM) Application in Quantity Surveying Firm for Quality Improvement. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Quantity surveying
MyCESMM seragamkan kaedah ukur bahan. [Video] (2015)
Quantity surveying firms
Competitive strategy and performance of quantity surveying firms in Malaysia. Journal of Construction in Developing Countries, 19 (2). pp. 15-32. ISSN 2180-4222 (2014)
Railway Construction Project
Accident cost ratio of bodily injury in railway construction projects. Malaysian Journal of Sustainable Environment (MySE), 5 (2). pp. 81-96. ISSN 0128-326X (2018)
Rainwater Harvesting (RWH)
Rainwater Harvesting (RWH) installation for buildings: a systematic review and meta-analysis approach. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 89-108. ISSN 0128-326X (2019)
Rainwater Harvesting System
A Feasibility Study on Rainwater Harvesting System for Mosque in Perak Tengah. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Rasch Measurement Model
Construction management graduates roles and tasks portfolio: analysing using rasch measurement model. Malaysian Construction Research Journal (MCRJ): International Conference on Applied Science and Technology (ICAST) 2017, 3 (1). pp. 18-24. ISSN 2590-4140 (2018)
Readiness
Green approach in road construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 102-107. ISBN 978-967-5741-67-8 (2015)
Real Estate
Effects of Covid-19 on local property market. [Newspaper] (2020)
Real property
Nang Rindok: bajet 2017- perumahan di Sarawak. [Video] (2016)
Recycle concrete waste aggregate
Mechanical properties of reinforced concrete beam with recycled coarse aggregates. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 106-115. ISSN 0128-326X (2017)
Recycled Concrete Aggregate
Recycled Concrete Aggregate for IBS Component. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Recycling
Recycled Concrete Aggregate for IBS Component. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Reinforced concrete beam
Mechanical properties of reinforced concrete beam with recycled coarse aggregates. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 106-115. ISSN 0128-326X (2017)
Reka bentuk projek
Pengurusan projek (project management). In: Mesyuarat Pemantapan Urusan Pentadbiran Kontrak Kerja Bersama Pegawai Penguasa Projek, February 2020, Melaka, Malaysia. (Submitted) (2020)
Rekabentuk
Perabot asrama antivandalisme. [Newspaper] (2019)
Rekabentuk blok
Kajian terhadap kriteria rekabentuk blok saling kunci dengan pendekatan perindustrian, fleksibel dan nyah-pasang. Jurnal Kejuruteraan, 30 (1). pp. 55-63. ISSN 0128-0198 (2018)
Religion Building
A Feasibility Study on Rainwater Harvesting System for Mosque in Perak Tengah. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Residential
A study on environmental impact from construction operation in residential areas. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 603-608. ISBN 978-967-5741-67-8 (2018)
Residential projects
Control of variation orders in the construction of residential projects in Malaysia. Journal of the Malaysian Institute of Planners, 20 (2). pp. 14-21. ISSN 1675-6215 (2022)
Risk analysis
Technology awareness of artificial intelligence (AI) application for risk analysis in construction projects. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 16. pp. 182-195. ISSN 2590-4140 (2020)
A study of road hazardsfaced by Malaysian school children using HIRARC. Malaysian Journal of Public Health Medicine, 18 (2). pp. 10-17. ISSN 2590-3829 (2018)
Risk culture
Conceptualising risk culture on Enterprise Risk Management (ERM) implementation in construction companies. Built Environment Journal, 17 (1): 5. pp. 58-69. ISSN 1675-5022 (2020)
Risk management
Designers approach in managing legal design risks in Malaysia. Built Environment Journal (BEJ), 12 (1): 5. pp. 34-49. ISSN 1675-5022 (2015)
Risk management plan
The implementation of risk management plan: towards safer hillside development project. Malaysian Construction Research Journal (MCRJ): International Conference on Applied Science and Technology (ICAST) 2017, 3 (1): 1. pp. 1-9. ISSN 1985-3807 (2018)
Risk taking
Risk cost analysis in Malay heritage conservation project. Journal of the Malaysian Institute of Planners, 18 (2): 5. pp. 59-72. ISSN 1675-6215 (2020)
Road problems
Lubang tiba-tiba di bandar Mentakab. [Newspaper] (2021)
Road safety
STAMP-Based analysis on the safety management system of bus operators. Journal of the Society of Automotive Engineers Malaysia, 3 (4). pp. 76-84. ISSN 2600-8092 (2019)
Road transport
A study of road hazardsfaced by Malaysian school children using HIRARC. Malaysian Journal of Public Health Medicine, 18 (2). pp. 10-17. ISSN 2590-3829 (2018)
Roles of safety officer
Space management’s regarding safety level at construction site. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 25-31. ISBN 978-967-5741-67-8 (2018)
Roofing
Properties of traditional clay roof tiles manufacture in Kelantan, Peninsular Malaysia. Built Environment Journal (BEJ, 11 (2): 2. pp. 17-34. ISSN 1675-5022 (2014)
Roofing tiles
Singgora tiles: perception of the community in Kota Bharu, Kelantan. Built Environment Journal (BEJ), 12 (1): 2. pp. 11-17. ISSN 1675-5022 (2015)
SOP
Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)
STAMP
STAMP-Based analysis on the safety management system of bus operators. Journal of the Society of Automotive Engineers Malaysia, 3 (4). pp. 76-84. ISSN 2600-8092 (2019)
Safety
AWANI Pagi: isu keselamatan & kesihatan di tempat kerja. [Video] (2019)
UNSPECIFIED, ed. Best practices on occupational safety and health in construction industry 2019. Department of Occupational Safety and Health, Putrajaya, Malaysia. ISBN 978-967-16706-2-0 (2019)
Guidelines on Occupational Safety and Health in Construction Industry (Management) 2017. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan, Kuala Lumpur. (2017)
Guidelines on occupational safety and health in tunnel construction. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan, Kuala Lumpur. (1998)
Guidelines on trenching for construction safety. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan. (2000)
Keselamatan tapak pembinaan: Zahrim Osman. [Video] (2014)
SOP PKP pemulihan - sektor pembinaan. [Phamplet] (Unpublished)
SPM 2017: keselamatan dan kesihatan pekerjaan kebangsaan. [Video] (2017)
Ucapan aluan Yang Berbahagia Datuk Ir. Ahmad ‘Asri Abdul Hamid, Ketua Eksekutif CIDB Malaysia. In: Safety And Health Assessment System In Construction (SHASSIC) Day 2020 dan Majlis Pelancaran Construction Industry Standard 27 (CIS 27:2019), 25 Februari 2020, Pusat Konvensyen CIDB Malaysia. (Unpublished) (2020)
Baiki tahap keselamatan, kesihatan pekerja pembinaan - Lam Thye. [Newspaper] (2020)
A study of road hazardsfaced by Malaysian school children using HIRARC. Malaysian Journal of Public Health Medicine, 18 (2). pp. 10-17. ISSN 2590-3829 (2018)
Safety performance of subcontractors in Malaysian construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 10. pp. 114-125. ISSN 2590-4140 (2020)
Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)
Case studies on the safety management at construction site. Journal of Sustainability Science and Management, 9 (2): 8. pp. 90-108. ISSN 1823-8556 (2014)
Hanya 100 pantau 14,000 tapak projek. [Newspaper] (2019)
Safety Management
HIRARC: a tool of safety improvement in the construction industry. In: 2nd INTERNATIONAL CONFERENCE ON BUILT ENVIRONMENT IN DEVELOPING COUNTRIES (ICBEDC 2008), 3rd - 4th December, 2008, Universiti Sains Malaysia, Penang, Malaysia. (Submitted) (2008)
Safety and health cost
Overview of safety & health cost framework for the construction of rail infrastructure projects. Malaysian Journal of Sustainable Environment (MySE), 2 (1). pp. 101-119. ISSN 0128-326X (2017)
Safety and health factor
Effects of the environmental, occupational safety and health regulations towards the successful completion of a project. Degree thesis, Universiti Teknologi MARA, Cawangan Pulau Pinang. (2007)
Safety hazards
Space management’s regarding safety level at construction site. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 25-31. ISBN 978-967-5741-67-8 (2018)
Safety management
Implications and strategies of safety management in high rise building construction to contractor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 7-12. ISBN 978-967-5741-67-8 (2018)
Safety requirements
Ensuring safety of our building. [Newspaper] (2021)
Saling kunci
Kajian terhadap kriteria rekabentuk blok saling kunci dengan pendekatan perindustrian, fleksibel dan nyah-pasang. Jurnal Kejuruteraan, 30 (1). pp. 55-63. ISSN 0128-0198 (2018)
Sandwich panel
An innovative Structural Insulated Panel (SIP): evaluation of durability properties and structural performance. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 456-461. ISBN 978-967-5741-67-8 (2018)
Sarawak
Cadangan bina ‘Terminal Makanan Sarawak’. [Newspaper] (2020)
Schedule
Construction planning for the success of projects: a case study. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 412-419. ISBN 978-967-5741-67-8 (2018)
Sektor seni bina
LBS dinobat 10 pemaju terbaik. [Newspaper] (2021)
Seni bina bangunan f
Menjejak keunikan seni bina masjid di Melaka. [Newspaper] (2021)
Seni bina campuran
Kekal ciri menarik dan bersejarah di Bukit Fraser. [Newspaper] (2021)
Senibina
Anugerah warisan kebudayaan 2021. [Newspaper] (2021)
Kesan ruang tidak kondusif. [Newspaper] (2020)
Separuh sfera
Menjejak keunikan seni bina masjid di Melaka. [Newspaper] (2021)
Serambi villa
Serambi Villa kediaman impian tepi tasik. [Newspaper] (2021)
Services costs
Essential features of SMM for M&E works in Malaysia. Berita QS, Iss. 2, 2018/2019, 2. pp. 11-12. (Unpublished) (2019)
Singgora
Properties of traditional clay roof tiles manufacture in Kelantan, Peninsular Malaysia. Built Environment Journal (BEJ, 11 (2): 2. pp. 17-34. ISSN 1675-5022 (2014)
Sistem binaan berindustri
Arahan Penggunaan JKR 20601-0251-18: Specification For Precast Concrete Works. Manual. Jabatan Kerja Raya Malaysia, Kuala Lumpur. (2019)
Site
Case studies on the safety management at construction site. Journal of Sustainability Science and Management, 9 (2): 8. pp. 90-108. ISSN 1823-8556 (2014)
Site planning
Performance of contractor: project delay. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 52-56. ISBN 978-967-5741-67-8 (2018)
Site survey
Hanya 100 pantau 14,000 tapak projek. [Newspaper] (2019)
Skilled workforce
Construction sector can power us towards high-income nation. [Newspaper] (2021)
Skills
Project manager success factors in managing green buildings in Malaysia: knowledge and skills. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)
Skyscraper
Pencakar Langit. [Newspaper] (2017)
Small medium
Partnering for small-sized contractors in Malaysia. Malaysian Construction Research Journal (MCRJ), 18 (1): 4. pp. 59-69. ISSN 1985-3807 (2016)
Smart City
Groundwork to build a smart city. [Newspaper] (2020)
Social engagement
Ucapan aluan Yang Berbahagia Datuk Ir. Ahmad ‘Asri Abdul Hamid, Ketua Eksekutif CIDB Malaysia. In: Safety And Health Assessment System In Construction (SHASSIC) Day 2020 dan Majlis Pelancaran Construction Industry Standard 27 (CIS 27:2019), 25 Februari 2020, Pusat Konvensyen CIDB Malaysia. (Unpublished) (2020)
Social transformation
Arkitek tak semesti bina bangunan besar. Berita Harian. (2019)
Soiling defects
Inhalable and respirable dust concentration of soiled stone, metal and ceramic artefact inside national museum Malaysia. Journal of the Malaysian Institute of Planners, 16 (2): 30. pp. 293-303. ISSN 1675-6215 (2018)
Space management
Space management’s regarding safety level at construction site. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 25-31. ISBN 978-967-5741-67-8 (2018)
Space management at construction site
Space management’s regarding safety level at construction site. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 25-31. ISBN 978-967-5741-67-8 (2018)
Spatial analysis
Flood hazard mapping in Perlis, using [GIS] and analytical hierarchy process [AHP]. Degree thesis, Universiti Teknologi MARA Cawangan Perlis. (2018)
Spatial planning
Malaysian development plan system: issues and problems, one decade after its reform (2001-2011). PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, XI. pp. 1-20. ISSN 0128-0945 (2013)
Specification
Arahan Penggunaan JKR 20601-0251-18: Specification For Precast Concrete Works. Manual. Jabatan Kerja Raya Malaysia, Kuala Lumpur. (2019)
Stakeholders
An exploratory study: building information modelling execution plan (BEP) procedure in mega construction projects. Malaysian Construction Research Journal (MCRJ), 18 (1): 2. pp. 29-40. ISSN 1985-3807 (2016)
Standard
MyCESMM seragamkan kaedah ukur bahan. [Video] (2015)
Standard Method of Measurement (SMM)
Adopting standardization in construction environment: standard method of measurement (SMMs). Procedia - Social and Behavioral Sciences, 170. pp. 37-48. ISSN 1877-0428 (2015)
Standard form
Ambiguity extension of time provisions in standard forms of contract: an analysis of PAM 2018 contract. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 18. pp. 208-227. ISSN 2590-4140 (2020)
Standard procedure
SOP PKP pemulihan - sektor pembinaan. [Phamplet] (Unpublished)
Standard tolerance
Empirical Research Approach Of Construction Waste Quantification And Standard Tolerance For Stratified Residential Building Projects. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 47-64. ISSN 0128-326X (2017)
Steep Slope
Challenges and control mechanism for development on highland and steep slope: the case of Klang Valley. Malaysian Construction Research Journal (MCRJ), 18 (1). pp. 41-58. ISSN 1985-3807 (2016)
Stratified residential building
Empirical Research Approach Of Construction Waste Quantification And Standard Tolerance For Stratified Residential Building Projects. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 47-64. ISSN 0128-326X (2017)
Structural insulated panel
An innovative Structural Insulated Panel (SIP): evaluation of durability properties and structural performance. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 456-461. ISBN 978-967-5741-67-8 (2018)
Struktur
Perabot asrama antivandalisme. [Newspaper] (2019)
Struktur binaan
Masjid kampung Belimbing Dalam mungkin antara tertua di Malaysia. [Newspaper] (2020)
Struktur haram
Henti amalan bina bangunan tanpa kelulusan PBT. [Newspaper] (2022)
Sub-contractor safety performance
Safety performance of subcontractors in Malaysian construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 10. pp. 114-125. ISSN 2590-4140 (2020)
Success criteria
Client governing success criteria in Building Information Modelling (BIM)-based projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 64-76. ISSN 2180-3242 (2020)
Superstructure
Pencakar Langit. [Newspaper] (2017)
Supply chain management
Developing a holistic project time management framework utilizing fundamental Supply Chain Management (SCM) tools to overcome delay in Malaysian public sector building projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 31-41. ISSN 2180-3242 (2020)
Sustainability
Collaboration initiative on green construction and sustainability through Industrialized Buildings Systems(IBS) in the Malaysian construction industry. International Journal of Sustainable Construction Engineering & Technology, 1 (1). pp. 119-127. ISSN 2180-3242 (2010)
Sustainability Construction
Managing factors influence defects on Industrialized Building System (IBS) components towards sustainability construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 177-183. ISBN 978-967-5741-67-8 (2018)
Sustainable
Sustainable housing affordability in Sabah. Journal of the Malaysian Institute of Planners, 5: 1. pp. 65-76. ISSN 1675-6215 (2016)
Sustainable Procurement
Sustainable procurement in construction – the way forward for malaysia. Jurnal Jabatan Kerja Raya Malaysia. pp. 21-28. (2013)
Sustainable construction
Green approach in road construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 102-107. ISBN 978-967-5741-67-8 (2015)
Sustainable development
Green approach in road construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 102-107. ISBN 978-967-5741-67-8 (2015)
System safety
STAMP-Based analysis on the safety management system of bus operators. Journal of the Society of Automotive Engineers Malaysia, 3 (4). pp. 76-84. ISSN 2600-8092 (2019)
Tapak pembinaan
Bekerja dalam cuaca buruk, majikan boleh diambil tindakan. [Newspaper] (2022)
Baiki tahap keselamatan, kesihatan pekerja pembinaan - Lam Thye. [Newspaper] (2020)
Technology awareness
Technology awareness of artificial intelligence (AI) application for risk analysis in construction projects. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 16. pp. 182-195. ISSN 2590-4140 (2020)
Terminal makanan
Cadangan bina ‘Terminal Makanan Sarawak’. [Newspaper] (2020)
Tile
Properties of traditional clay roof tiles manufacture in Kelantan, Peninsular Malaysia. Built Environment Journal (BEJ, 11 (2): 2. pp. 17-34. ISSN 1675-5022 (2014)
Time and cost time model
Control of variation orders in the construction of residential projects in Malaysia. Journal of the Malaysian Institute of Planners, 20 (2). pp. 14-21. ISSN 1675-6215 (2022)
Time control
Improving cost and time control in construction using Building Information Model (BIM): a review. Pertanika Journal Science & Technology, 26 (1): 2. 21 -36. ISSN 0128-7680 (2018)
Time management,
Developing a holistic project time management framework utilizing fundamental Supply Chain Management (SCM) tools to overcome delay in Malaysian public sector building projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 31-41. ISSN 2180-3242 (2020)
Time overrun
Impact of design changes in construction project. Malaysian Journal of Sustainable Environment (MySE), 4 (1). pp. 1-18. ISSN 0128-326X (2018)
Title
PropertyGuru reaches out to developers with TechCare. [Newspaper] (2020)
Architects urged to design exciting eco-tourism buildings in Sabah. [Newspaper] (2018)
Pencakar Langit. [Newspaper] (2017)
Kejuruteraan kos melestari kewangan, pembangunan. [Newspaper] (2020)
Join us in developing state’s digital economy, says CM. [Newspaper] (2020)
Tokong
Anugerah warisan kebudayaan 2021. [Newspaper] (2021)
Town & Regional Planning
Projek dalam fasa 'bersedia'. [Newspaper] (2020)
Town Planning
Groundwork to build a smart city. [Newspaper] (2020)
Town management
Lubang tiba-tiba di bandar Mentakab. [Newspaper] (2021)
Traditional Malay house
Singgora tiles: perception of the community in Kota Bharu, Kelantan. Built Environment Journal (BEJ), 12 (1): 2. pp. 11-17. ISSN 1675-5022 (2015)
Traditional settlement
The orientation setting of buildings in the traditional Malay settlement: a case study of Kg Seri Tanjung, Sungai Udang, Melaka. Journal of the Malaysian Institute of Planners, 18 (2): 15. pp. 170-180. ISSN 1675-6215 (2020)
Transportation
STAMP-Based analysis on the safety management system of bus operators. Journal of the Society of Automotive Engineers Malaysia, 3 (4). pp. 76-84. ISSN 2600-8092 (2019)
Trenches
Guidelines on trenching for construction safety. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan. (2000)
Tunnel construction
Guidelines on occupational safety and health in tunnel construction. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan, Kuala Lumpur. (1998)
Uniform Building By-Laws (UBBL)
Ensuring safety of our building. [Newspaper] (2021)
Variables
Key factors of BIM implementation for interior design firms in Malaysia. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 175-184. ISSN 2180-3242 (2020)
Variation order
Liabilities of designer towards variation cost in commercial buildings in Kuching, Sarawak. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 276-284. ISBN 978-967-5741-67-8 (2018)
Vegetation
Developing criteria and variables for evaluating the effects of vegetation on single-family houses. Built Environment Journal, 12 (2): 1. pp. 1-11. ISSN 1675-5022 (2015)
Virtual galleries
PropertyGuru reaches out to developers with TechCare. [Newspaper] (2020)
Virtual tours show units
PropertyGuru reaches out to developers with TechCare. [Newspaper] (2020)
Visual Comfort
Influence of Lighting and Colour Usage In Higher Education, a Case Study Of an Architectural Studio. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Waste
Recycled Concrete Aggregate for IBS Component. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
Waste quantification
Empirical Research Approach Of Construction Waste Quantification And Standard Tolerance For Stratified Residential Building Projects. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 47-64. ISSN 0128-326X (2017)
flexural strength
Mechanical properties of reinforced concrete beam with recycled coarse aggregates. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 106-115. ISSN 0128-326X (2017)
human factors
Developing criteria and variables for evaluating the effects of vegetation on single-family houses. Built Environment Journal, 12 (2): 1. pp. 1-11. ISSN 1675-5022 (2015)
incentive
SME Go. [Website]
knowledge sharing
A conceptual framework for managing higher dimension knowledge in BIM environment. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 20. pp. 237-248. ISSN 2590-4140 (2020)
lighting
Influence of Lighting and Colour Usage In Higher Education, a Case Study Of an Architectural Studio. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)
single-family houses
Developing criteria and variables for evaluating the effects of vegetation on single-family houses. Built Environment Journal, 12 (2): 1. pp. 1-11. ISSN 1675-5022 (2015)
İndicators
Exploration of cause contributing defect at high-rise residential building in Klang Valley: a literature review. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 103-108. ISBN 978-967-5741-67-8 (2018)