Items where Subject is "Construction Management"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | Keywords
Jump to: 3D | Accident | Accident Costs Ratio | Affordability | Air pollution | Airborne particulates matter | Ambiguous provisions | ArcGIS | Archictecture | Architechture | Architects Act 1967 | Architectural design | Architecture | Architecture Sign and Symbol | Artefact | Artificial Intelligence | Artificial intelligence | Attributes | Audit projek kerajaan | Awareness | Awareness and compliance, | BIM | BIM Execution Plan (BEP) | Bahan binaan | Bandar Mentakab | Bangunan anjung tinjau | Barriers | Batu laterit | Benefits | Big data analytics | Brightness | Building | Building Automation System (BAS) | Building Characteristic | Building Construction | Building Defects | Building Information Modelling | Building Information Modelling (BIM) | Building Layout | Building conservation | Building construction | Building designs | Building life cycle | Building safety | Building surveying | Built Form | Bukit Fraser | Business performance | CIDB | Challenges | Children | Claims | Client | Cloud-based | Competitive Advantage | Competitive strategy | Competitiveness | Compliance | Composite walling | Computer Technology and Networking | Concrete | Conservation | Construction | Construction Claims | Construction Industry | Construction Project | Construction Safety | Construction companies | Construction contracts | Construction dispute | Construction health and safety | Construction industry | Construction knowledge areas | Construction project | Construction project life cycle | Construction project performance | Construction projects | Construction sector | Construction waste | Construction works | Consultants | Content analysis | Contract management | Contract prolongation | Contractor | Contractors | Control | Cost | Cost control | Cost overrun | Crime Prevention Through Environmental Design (CPTED) | Critical path method (CPM) | Cuaca buruk | DOSH | Defects | Delay | Delay and cost overrun | Demolished Concrete | Design | Design changes | Design technology | Design works | Developer | Development | Development plan | Digital economy | Digitalisasi industri pembinaan | Dispute resolution | Doctrine of privity | Drainage | EIA | Economic influence | Economic life | Economy | Economy life | Employee Well-Being | Energy usage | Enterprise risk management (ERM) | Environment | Environmental Quality Act 1974 | Environmental sustainability | Extension of time | Extension of time and performance | Factors | Factors Influence | Fakulti Rekabentuk dan Senibina | Feasibility | Field work | Finance | Fire safety management | Firm competitiveness | Flood | Foamed concrete | Foreign architects | GIS | Gantt chart | Garis panduan | Gazebo | Governance | Green Building Index (GBI) | Green Construction | Green Technology | Green approach | Green architecture | Green construction | Green roof | Green technology | Gross Domestic Product (GDP) | Haily | Hazard | Hazard identification | Health | Heritage building conservation | Heritage project | High rise building | Higher dimension knowledge | Highland | Hillside development project | Hilly Area | Historic Building Information Modelling | Holdings | Housing | Housing quality | IBS | IR 4.0 | Implementation | Implementation and management | Industrialised Building System (IBS) | Industrialised building system (IBS) | Industrialized Building System (IBS) | Industry Requirement | Information Technology | Information technology infrastructure | Innovation | Insentif | Integrity | Intelligent Systems | Interior design | Internet of Things (IoT) | Jaringan Pengangkutan Awam | Kaedah komunikasi | Kawasan strategik | Kebajikan | Keberkesanan komunikasi | Kejuruteraan Kos | Kejurute­raan awam | Kepakaran pembinaan | Kesan alam sekitar | Keselamatan | Keselamatan awam | Keselamatan pekerja | Kesihatan | Kesihatan pekerjaan | Key factors | Knowledge | Knowledge management | Komunikasi | Kontraktor kelas A | Kos pembinaan | Kualiti binaan | Labour force | Landscape | Late payments | Legal | Legislation | Liability | Liberalization | Lifestyle architecture | Location of Bodily Injury | Low Cost Flats | Low cost house | Low-carbon blueprint | Magnesium oxide | Maintenance | Malay House | Malay settlement | Malaysia | Malaysia bus crash | Malaysian Construction Industry | Malaysian construction | Malaysian construction project | Malaysian standard form of contract | Management | Marketability factor | Masjid | Material | Material Culture | Materials suppliers | Measurement of building | Mega projects | Menara Merdeka 118 | Mercu tanda | Mitigation | OSH ICOP | OSHA | Occupational | Online sales platforms | Opinion of value | Organisasi projek | Orientation pattern | Outdoor Spaces | PPE | Partnering | Pasang siap | Pasaran ACE Bursa Malaysia | Pelan Landskap | Pemandangan tropika | Pembangunan berdaya tahan iklim | Pembangunan hotel | Pembinaan | Pembinaan masjid | Pengurusan | Pengurusan projek | Pentadbiran sumber manusia | Penyesuaian iklim | Perabot | Perancangan Bandar dan Wilayah | Perkampungan al-quran | Perlaksanaan | Persatuan Arkitek Perunding Malaysia (ACAM) | Persekitaran pekerjaan | Perumahan lestari | Place of work | Planning | Planning reform | Planning system | Planning tools | Policy and procedure | Politics and Architecture | Process | Profession | Professional architect | Profitability | Project | Project Management | Project Manager | Project contract | Project performance | Projek | Projek bermasalah | Projek perumahan | Property | Property Development | Property developers and agents | Property management | Putrajaya | QLASSIC | Quality | Quality Improvement | Quality performance | Quantity Surveying Firm | Quantity surveying | Quantity surveying firms | Railway Construction Project | Rainwater Harvesting (RWH) | Rainwater Harvesting System | Rasch Measurement Model | Readiness | Real Estate | Real property | Recycle concrete waste aggregate | Recycled Concrete Aggregate | Recycling | Reinforced concrete beam | Reka bentuk projek | Rekabentuk | Rekabentuk blok | Religion Building | Residential | Residential projects | Risk analysis | Risk culture | Risk management | Risk management plan | Risk taking | Road problems | Road safety | Road transport | Roles of safety officer | Roofing | Roofing tiles | SOP | STAMP | Safety | Safety Management | Safety and health cost | Safety and health factor | Safety hazards | Safety management | Safety requirements | Saling kunci | Sandwich panel | Sarawak | Schedule | Sektor seni bina | Seni bina bangunan f | Seni bina campuran | Senibina | Separuh sfera | Serambi villa | Services costs | Singgora | Sistem binaan berindustri | Site | Site planning | Site survey | Skilled workforce | Skills | Skyscraper | Small medium | Smart City | Social engagement | Social transformation | Soiling defects | Space management | Space management at construction site | Spatial analysis | Spatial planning | Specification | Stakeholders | Standard | Standard Method of Measurement (SMM) | Standard form | Standard procedure | Standard tolerance | Steep Slope | Stratified residential building | Structural insulated panel | Struktur | Struktur binaan | Struktur haram | Sub-contractor safety performance | Success criteria | Superstructure | Supply chain management | Sustainability | Sustainability Construction | Sustainable | Sustainable Procurement | Sustainable construction | Sustainable development | System safety | Tapak pembinaan | Technology awareness | Terminal makanan | Tile | Time and cost time model | Time control | Time management, | Time overrun | Title | Tokong | Town & Regional Planning | Town Planning | Town management | Traditional Malay house | Traditional settlement | Transportation | Trenches | Tunnel construction | Uniform Building By-Laws (UBBL) | Variables | Variation order | Vegetation | Virtual galleries | Virtual tours show units | Visual Comfort | Waste | Waste quantification | flexural strength | human factors | incentive | knowledge sharing | lighting | single-family houses | İndicators
Number of items at this level: 521.

3D

A conceptual framework for managing higher dimension knowledge in BIM environment. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 20. pp. 237-248. ISSN 2590-4140 (2020)

Accident

Safety performance of subcontractors in Malaysian construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 10. pp. 114-125. ISSN 2590-4140 (2020)

Space management’s regarding safety level at construction site. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 25-31. ISBN 978-967-5741-67-8 (2018)

Accident Costs Ratio

Accident cost ratio of bodily injury in railway construction projects. Malaysian Journal of Sustainable Environment (MySE), 5 (2). pp. 81-96. ISSN 0128-326X (2018)

Affordability

Sustainable housing affordability in Sabah. Journal of the Malaysian Institute of Planners, 5: 1. pp. 65-76. ISSN 1675-6215 (2016)

Air pollution

A study on environmental impact from construction operation in residential areas. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 603-608. ISBN 978-967-5741-67-8 (2018)

Airborne particulates matter

Inhalable and respirable dust concentration of soiled stone, metal and ceramic artefact inside national museum Malaysia. Journal of the Malaysian Institute of Planners, 16 (2): 30. pp. 293-303. ISSN 1675-6215 (2018)

Ambiguous provisions

Ambiguity extension of time provisions in standard forms of contract: an analysis of PAM 2018 contract. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 18. pp. 208-227. ISSN 2590-4140 (2020)

ArcGIS

Flood hazard mapping in Perlis, using [GIS] and analytical hierarchy process [AHP]. Degree thesis, Universiti Teknologi MARA Cawangan Perlis. (2018)

Archictecture

Manfaat nilai estetika, keunikan bangunan lama. [Newspaper] (2016)

Architechture

Architects urged to design exciting eco-tourism buildings in Sabah. [Newspaper] (2018)

Architects Act 1967

Architects want act reviewed encourage local participation. [Newspaper] (2020)

Architectural design

Arkitek tak semesti bina bangunan besar. Berita Harian. (2019)

Architecture

MyCESMM seragamkan kaedah ukur bahan. [Video] (2015)

Nang Rindok: bajet 2017- perumahan di Sarawak. [Video] (2016)

Projek sistem binaan berindustri – hasil inovasi 5 pensyarah PSMZA. [Video] (2019)

Rancangan Do-iT: potensi kerjaya industri binaan ABM. [Video] (2018)

Jom terokai monumen bersejarah di negara kita. [Newspaper] (2020)

Kesan ruang tidak kondusif. [Newspaper] (2020)

Architecture Sign and Symbol

Built form properties as sign and symbols of patron political ideology. Jurnal Kejuruteraan, 29 (2). pp. 87-96. ISSN 0128-0198 (2017)

Artefact

Inhalable and respirable dust concentration of soiled stone, metal and ceramic artefact inside national museum Malaysia. Journal of the Malaysian Institute of Planners, 16 (2): 30. pp. 293-303. ISSN 1675-6215 (2018)

Artificial Intelligence

Industrial Revolution 4.0 can help boost construction industry. [Newspaper] (2020)

Artificial intelligence

Technology awareness of artificial intelligence (AI) application for risk analysis in construction projects. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 16. pp. 182-195. ISSN 2590-4140 (2020)

Attributes

Historic Building Information Modelling (HBIM) for Malaysian construction industry. PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, 16 (3): 28. pp. 332-343. ISSN 0128-0945 (2018)

Audit projek kerajaan

Isu integriti dalam pelaksanaan projek-projek kerajaan daripada perspektif Jabatan Audit Negara. In: Program Transformasi Kepimpinan Juruukur/Jurugeospatial JUPEM Tahun 2020, 1 & 2 Februari 2020, Institut Tanah dan Ukur Negara (INSTUN). (Unpublished) (2020)

Awareness

Towards implementation of green technology in Sabah construction industry. Materials Science and Engineering, 291. ISSN 1757-899X (2017)

Awareness and compliance,

Compliance with the use of personal protective equipment (PPE) on construction sites in Johor, Malaysia. International Journal of Real Estate Studies, 14 (1): 12. pp. 123-138. ISSN 1823-8505 (2020)

BIM

Improving cost and time control in construction using Building Information Model (BIM): a review. Pertanika Journal Science & Technology, 26 (1): 2. 21 -36. ISSN 0128-7680 (2018)

BIM Execution Plan (BEP)

An exploratory study: building information modelling execution plan (BEP) procedure in mega construction projects. Malaysian Construction Research Journal (MCRJ), 18 (1): 2. pp. 29-40. ISSN 1985-3807 (2016)

Bahan binaan

Kos bahan binaan bangunan meningkat. [Newspaper] (2022)

Bandar Mentakab

Lubang tiba-tiba di bandar Mentakab. [Newspaper] (2021)

Bangunan anjung tinjau

Merdeka 118 dilengkapi pelbagai keistimewaan. [Newspaper] (2021)

Barriers

Key factors of BIM implementation for interior design firms in Malaysia. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 175-184. ISSN 2180-3242 (2020)

Batu laterit

Masjid kampung Belimbing Dalam mungkin antara tertua di Malaysia. [Newspaper] (2020)

Benefits

Historic Building Information Modelling (HBIM) for Malaysian construction industry. PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, 16 (3): 28. pp. 332-343. ISSN 0128-0945 (2018)

Sustainable procurement in construction – the way forward for malaysia. Jurnal Jabatan Kerja Raya Malaysia. pp. 21-28. (2013)

Big data analytics

Exploring the potential application of big data in the construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 19. pp. 228-236. ISSN 2590-4140 (2020)

Brightness

Influence of Lighting and Colour Usage In Higher Education, a Case Study Of an Architectural Studio. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Building

Essential features of SMM for M&E works in Malaysia. Berita QS, Iss. 2, 2018/2019, 2. pp. 11-12. (Unpublished) (2019)

MyCESMM seragamkan kaedah ukur bahan. [Video] (2015)

Manfaat nilai estetika, keunikan bangunan lama. [Newspaper] (2016)

Building Automation System (BAS)

Building Information Modelling (BIM) in building life cycle. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, Perak, pp. 434-439. ISBN 978-967-5741-67-8 (2018)

Building Characteristic

Rainwater Harvesting (RWH) installation for buildings: a systematic review and meta-analysis approach. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 89-108. ISSN 0128-326X (2019)

Building Construction

Rainwater Harvesting (RWH) installation for buildings: a systematic review and meta-analysis approach. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 89-108. ISSN 0128-326X (2019)

Perak heritage mosques: evaluating the defects of building elements. Malaysian Journal of Sustainable Environment (MySE), 4 (1). pp. 77-94. ISSN 0128-326X (2018)

Late and non-payments issues in the Malaysian construction industry: perspective of building material suppliers. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 39-56. ISSN 0128-326X

Building Defects

Exploration of cause contributing defect at high-rise residential building in Klang Valley: a literature review. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 103-108. ISBN 978-967-5741-67-8 (2018)

Building Information Modelling

Key factors of BIM implementation for interior design firms in Malaysia. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 175-184. ISSN 2180-3242 (2020)

The Readiness of Building Information Modeling (BIM) Application in Quantity Surveying Firm for Quality Improvement. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Building Information Modelling (BIM)

Client governing success criteria in Building Information Modelling (BIM)-based projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 64-76. ISSN 2180-3242 (2020)

An exploratory study: building information modelling execution plan (BEP) procedure in mega construction projects. Malaysian Construction Research Journal (MCRJ), 18 (1): 2. pp. 29-40. ISSN 1985-3807 (2016)

A conceptual framework for managing higher dimension knowledge in BIM environment. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 20. pp. 237-248. ISSN 2590-4140 (2020)

Building Information Modelling (BIM) in building life cycle. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, Perak, pp. 434-439. ISBN 978-967-5741-67-8 (2018)

Building Layout

Flat Layout Affecting Social Interaction. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Building conservation

Heritage building information modelling: the rise of quantity surveyors. Berita QS, Iss. 1, 2018/2019, 1. pp. 21-26. (Unpublished) (2018)

Building construction

Developing criteria and variables for evaluating the effects of vegetation on single-family houses. Built Environment Journal, 12 (2): 1. pp. 1-11. ISSN 1675-5022 (2015)

Building designs

Engaging people through lifestyle architecture. [Newspaper] (2020)

Building life cycle

Building Information Modelling (BIM) in building life cycle. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, Perak, pp. 434-439. ISBN 978-967-5741-67-8 (2018)

Building safety

Fire safety policy and procedure at government hospital: case study Hospital Raja Perempuan Zainab II. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 196-201. ISBN 978-967-5741-67-8 (2018)

Ensuring safety of our building. [Newspaper] (2021)

Building surveying

Nang Rindok: bajet 2017- perumahan di Sarawak. [Video] (2016)

Built Form

Built form properties as sign and symbols of patron political ideology. Jurnal Kejuruteraan, 29 (2). pp. 87-96. ISSN 0128-0198 (2017)

Bukit Fraser

Kekal ciri menarik dan bersejarah di Bukit Fraser. [Newspaper] (2021)

Business performance

Competitive strategy and performance of quantity surveying firms in Malaysia. Journal of Construction in Developing Countries, 19 (2). pp. 15-32. ISSN 2180-4222 (2014)

CIDB

Peralihan teknologi pembinaan era COVID-19. [Newspaper] (2020)

Challenges

Historic Building Information Modelling (HBIM) for Malaysian construction industry. PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, 16 (3): 28. pp. 332-343. ISSN 0128-0945 (2018)

Sustainable procurement in construction – the way forward for malaysia. Jurnal Jabatan Kerja Raya Malaysia. pp. 21-28. (2013)

Children

A study of road hazardsfaced by Malaysian school children using HIRARC. Malaysian Journal of Public Health Medicine, 18 (2). pp. 10-17. ISSN 2590-3829 (2018)

Claims

A survey of Malaysian consultants on construction claim problems. Built Environment Journal (BEJ), 11 (1): 1. pp. 1-9. ISSN 1675-5022 (2014)

Client

Client governing success criteria in Building Information Modelling (BIM)-based projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 64-76. ISSN 2180-3242 (2020)

Cloud-based

A conceptual framework for managing higher dimension knowledge in BIM environment. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 20. pp. 237-248. ISSN 2590-4140 (2020)

Competitive Advantage

Knowledge retention for sustaining competitive advantage in construction industry: a conceptual. Malaysian Construction Research Journal (MCRJ), 3 (1). pp. 10-17. ISSN 2590-4140 (2018)

Competitive strategy

Competitive strategy and performance of quantity surveying firms in Malaysia. Journal of Construction in Developing Countries, 19 (2). pp. 15-32. ISSN 2180-4222 (2014)

Competitiveness

Construction sector can power us towards high-income nation. [Newspaper] (2021)

Compliance

MyCESMM seragamkan kaedah ukur bahan. [Video] (2015)

Fire safety policy and procedure at government hospital: case study Hospital Raja Perempuan Zainab II. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 196-201. ISBN 978-967-5741-67-8 (2018)

Composite walling

An innovative Structural Insulated Panel (SIP): evaluation of durability properties and structural performance. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 456-461. ISBN 978-967-5741-67-8 (2018)

Computer Technology and Networking

Industrial Revolution 4.0 can help boost construction industry. [Newspaper] (2020)

Concrete

Arahan Penggunaan JKR 20601-0251-18: Specification For Precast Concrete Works. Manual. Jabatan Kerja Raya Malaysia, Kuala Lumpur. (2019)

Conservation

Properties of traditional clay roof tiles manufacture in Kelantan, Peninsular Malaysia. Built Environment Journal (BEJ, 11 (2): 2. pp. 17-34. ISSN 1675-5022 (2014)

Singgora tiles: perception of the community in Kota Bharu, Kelantan. Built Environment Journal (BEJ), 12 (1): 2. pp. 11-17. ISSN 1675-5022 (2015)

Arkitek tak semesti bina bangunan besar. Berita Harian. (2019)

Risk cost analysis in Malay heritage conservation project. Journal of the Malaysian Institute of Planners, 18 (2): 5. pp. 59-72. ISSN 1675-6215 (2020)

Construction

Mempercepatkan pelaksanaan projek pembangunan RMK9. In: Mesyuarat Majlis Tindakan Negara Bil 1/2009, 25 Jun 2009, Putrajaya. (Unpublished) (2009)

Projek sistem binaan berindustri – hasil inovasi 5 pensyarah PSMZA. [Video] (2019)

Addressing issues on quality in low-cost house construction in Selangor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 32-37. ISBN 978-967-5741-67-8 (2018)

A study on environmental impact from construction operation in residential areas. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 603-608. ISBN 978-967-5741-67-8 (2018)

Isu integriti dalam pelaksanaan projek-projek kerajaan daripada perspektif Jabatan Audit Negara. In: Program Transformasi Kepimpinan Juruukur/Jurugeospatial JUPEM Tahun 2020, 1 & 2 Februari 2020, Institut Tanah dan Ukur Negara (INSTUN). (Unpublished) (2020)

Construction related deaths and injuries alarming. [Newspaper] (2020)

A study on the readiness of Malaysian contractors towards trade liberalization. Malaysian Construction Research Journal (MCRJ), 18 (1): 1. pp. 1-27. ISSN 1985-3807 (2016)

Peralihan teknologi pembinaan era COVID-19. [Newspaper] (2020)

Control of variation orders in the construction of residential projects in Malaysia. Journal of the Malaysian Institute of Planners, 20 (2). pp. 14-21. ISSN 1675-6215 (2022)

Impact of design changes in construction project. Malaysian Journal of Sustainable Environment (MySE), 4 (1). pp. 1-18. ISSN 0128-326X (2018)

Performance of contractor: project delay. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 52-56. ISBN 978-967-5741-67-8 (2018)

Sustainable procurement in construction – the way forward for malaysia. Jurnal Jabatan Kerja Raya Malaysia. pp. 21-28. (2013)

Case studies on the safety management at construction site. Journal of Sustainability Science and Management, 9 (2): 8. pp. 90-108. ISSN 1823-8556 (2014)

Construction Claims

A survey of Malaysian consultants on construction claim problems. Built Environment Journal (BEJ), 11 (1): 1. pp. 1-9. ISSN 1675-5022 (2014)

Construction Industry

Collaboration initiative on green construction and sustainability through Industrialized Buildings Systems(IBS) in the Malaysian construction industry. International Journal of Sustainable Construction Engineering & Technology, 1 (1). pp. 119-127. ISSN 2180-3242 (2010)

Knowledge retention for sustaining competitive advantage in construction industry: a conceptual. Malaysian Construction Research Journal (MCRJ), 3 (1). pp. 10-17. ISSN 2590-4140 (2018)

Construction Project

Effects of the environmental, occupational safety and health regulations towards the successful completion of a project. Degree thesis, Universiti Teknologi MARA, Cawangan Pulau Pinang. (2007)

Construction Safety

HIRARC: a tool of safety improvement in the construction industry. In: 2nd INTERNATIONAL CONFERENCE ON BUILT ENVIRONMENT IN DEVELOPING COUNTRIES (ICBEDC 2008), 3rd - 4th December, 2008, Universiti Sains Malaysia, Penang, Malaysia. (Submitted) (2008)

Construction companies

Conceptualising risk culture on Enterprise Risk Management (ERM) implementation in construction companies. Built Environment Journal, 17 (1): 5. pp. 58-69. ISSN 1675-5022 (2020)

Construction contracts

Ambiguity extension of time provisions in standard forms of contract: an analysis of PAM 2018 contract. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 18. pp. 208-227. ISSN 2590-4140 (2020)

Critical analysis of “doctrine of privity” in Malaysian construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 9. pp. 103-113. ISSN 2590-4140 (2020)

Construction dispute

Assessing the Malaysian standard form of contract in relation to the current construction dispute and dispute resolution. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 13. pp. 151-161. ISSN 2590-4140 (2020)

Construction health and safety

Compliance with the use of personal protective equipment (PPE) on construction sites in Johor, Malaysia. International Journal of Real Estate Studies, 14 (1): 12. pp. 123-138. ISSN 1823-8505 (2020)

Construction industry

UNSPECIFIED, ed. Best practices on occupational safety and health in construction industry 2019. Department of Occupational Safety and Health, Putrajaya, Malaysia. ISBN 978-967-16706-2-0 (2019)

Essential features of SMM for M&E works in Malaysia. Berita QS, Iss. 2, 2018/2019, 2. pp. 11-12. (Unpublished) (2019)

Partnering for small-sized contractors in Malaysia. Malaysian Construction Research Journal (MCRJ), 18 (1): 4. pp. 59-69. ISSN 1985-3807 (2016)

Liabilities of designer towards variation cost in commercial buildings in Kuching, Sarawak. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 276-284. ISBN 978-967-5741-67-8 (2018)

Constraints in implementing qlassic for stratified housing. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 171-176. ISBN 978-967-5741-67-8 (2018)

Late and non-payments issues in the Malaysian construction industry: perspective of building material suppliers. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 39-56. ISSN 0128-326X

Towards implementation of green technology in Sabah construction industry. Materials Science and Engineering, 291. ISSN 1757-899X (2017)

Heritage building information modelling: the rise of quantity surveyors. Berita QS, Iss. 1, 2018/2019, 1. pp. 21-26. (Unpublished) (2018)

Exploring the potential application of big data in the construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 19. pp. 228-236. ISSN 2590-4140 (2020)

Critical analysis of “doctrine of privity” in Malaysian construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 9. pp. 103-113. ISSN 2590-4140 (2020)

Developing a holistic project time management framework utilizing fundamental Supply Chain Management (SCM) tools to overcome delay in Malaysian public sector building projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 31-41. ISSN 2180-3242 (2020)

Construction knowledge areas

Project performance framework: the role of knowledge management and information technology infrastructure. Asian Journal of Business and Accounting, 1 (2). pp. 39-64. ISSN 1985-4064 (2008)

Construction project

Overview of safety & health cost framework for the construction of rail infrastructure projects. Malaysian Journal of Sustainable Environment (MySE), 2 (1). pp. 101-119. ISSN 0128-326X (2017)

Factors affecting quality in Construction Project Life Cycle (CPLC). The International Journal of Integrated Engineering, 14 (1). pp. 322-355. ISSN 2229-838X (2022)

Construction project life cycle

Factors affecting quality in Construction Project Life Cycle (CPLC). The International Journal of Integrated Engineering, 14 (1). pp. 322-355. ISSN 2229-838X (2022)

Construction project performance

Project performance framework: the role of knowledge management and information technology infrastructure. Asian Journal of Business and Accounting, 1 (2). pp. 39-64. ISSN 1985-4064 (2008)

Construction projects

Technology awareness of artificial intelligence (AI) application for risk analysis in construction projects. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 16. pp. 182-195. ISSN 2590-4140 (2020)

Construction sector

Construction sector can power us towards high-income nation. [Newspaper] (2021)

Construction waste

Empirical Research Approach Of Construction Waste Quantification And Standard Tolerance For Stratified Residential Building Projects. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 47-64. ISSN 0128-326X (2017)

Construction works

Adopting standardization in construction environment: standard method of measurement (SMMs). Procedia - Social and Behavioral Sciences, 170. pp. 37-48. ISSN 1877-0428 (2015)

Consultants

Liabilities of designer towards variation cost in commercial buildings in Kuching, Sarawak. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 276-284. ISBN 978-967-5741-67-8 (2018)

Content analysis

Assessing the Malaysian standard form of contract in relation to the current construction dispute and dispute resolution. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 13. pp. 151-161. ISSN 2590-4140 (2020)

Contract management

Ambiguity extension of time provisions in standard forms of contract: an analysis of PAM 2018 contract. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 18. pp. 208-227. ISSN 2590-4140 (2020)

Contract prolongation

Ambiguity extension of time provisions in standard forms of contract: an analysis of PAM 2018 contract. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 18. pp. 208-227. ISSN 2590-4140 (2020)

Contractor

Kontraktor O&G jutawan berusia 33 tahun. [Newspaper] (2017)

Kontraktor bumiputera perlu berani rebut peluang projek - PKMM. [Newspaper] (2018)

SME Go. [Website]

Partnering for small-sized contractors in Malaysia. Malaysian Construction Research Journal (MCRJ), 18 (1): 4. pp. 59-69. ISSN 1985-3807 (2016)

A study on the readiness of Malaysian contractors towards trade liberalization. Malaysian Construction Research Journal (MCRJ), 18 (1): 1. pp. 1-27. ISSN 1985-3807 (2016)

Implications and strategies of safety management in high rise building construction to contractor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 7-12. ISBN 978-967-5741-67-8 (2018)

Contractors

Effects of the environmental, occupational safety and health regulations towards the successful completion of a project. Degree thesis, Universiti Teknologi MARA, Cawangan Pulau Pinang. (2007)

Control

Control of variation orders in the construction of residential projects in Malaysia. Journal of the Malaysian Institute of Planners, 20 (2). pp. 14-21. ISSN 1675-6215 (2022)

Cost

Exploring the potential application of big data in the construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 19. pp. 228-236. ISSN 2590-4140 (2020)

Kejuruteraan kos melestari kewangan, pembangunan. [Newspaper] (2020)

Cost control

Improving cost and time control in construction using Building Information Model (BIM): a review. Pertanika Journal Science & Technology, 26 (1): 2. 21 -36. ISSN 0128-7680 (2018)

Cost overrun

Impact of design changes in construction project. Malaysian Journal of Sustainable Environment (MySE), 4 (1). pp. 1-18. ISSN 0128-326X (2018)

Crime Prevention Through Environmental Design (CPTED)

UNSPECIFIED, ed. Reka Bentuk bandar Selamat: Panduan Pelaksanaan. Unit Khas NKRA Bandar Selamat, Kuala Lumpur. ISBN 9789675456176 (2010)

Critical path method (CPM)

Construction planning for the success of projects: a case study. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 412-419. ISBN 978-967-5741-67-8 (2018)

Cuaca buruk

Bekerja dalam cuaca buruk, majikan boleh diambil tindakan. [Newspaper] (2022)

DOSH

Guidelines on Occupational Safety and Health in Construction Industry (Management) 2017. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan, Kuala Lumpur. (2017)

Guidelines on occupational safety and health in tunnel construction. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan, Kuala Lumpur. (1998)

Guidelines on trenching for construction safety. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan. (2000)

Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)

Defects

Performance of contractor: project delay. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 52-56. ISBN 978-967-5741-67-8 (2018)

Managing factors influence defects on Industrialized Building System (IBS) components towards sustainability construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 177-183. ISBN 978-967-5741-67-8 (2018)

Delay

Developing a holistic project time management framework utilizing fundamental Supply Chain Management (SCM) tools to overcome delay in Malaysian public sector building projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 31-41. ISSN 2180-3242 (2020)

Performance of contractor: project delay. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 52-56. ISBN 978-967-5741-67-8 (2018)

Delay and cost overrun

Improving cost and time control in construction using Building Information Model (BIM): a review. Pertanika Journal Science & Technology, 26 (1): 2. 21 -36. ISSN 0128-7680 (2018)

Demolished Concrete

Recycled Concrete Aggregate for IBS Component. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Design

Architects urged to design exciting eco-tourism buildings in Sabah. [Newspaper] (2018)

Design changes

Impact of design changes in construction project. Malaysian Journal of Sustainable Environment (MySE), 4 (1). pp. 1-18. ISSN 0128-326X (2018)

Design technology

This East Malaysian house showcases beauty in the ordinary. [Newspaper] (2020)

Design works

Designers approach in managing legal design risks in Malaysia. Built Environment Journal (BEJ), 12 (1): 5. pp. 34-49. ISSN 1675-5022 (2015)

Developer

Most property developers to report weaker sales in 2019. [Newspaper] (2020)

Development

Challenges and control mechanism for development on highland and steep slope: the case of Klang Valley. Malaysian Construction Research Journal (MCRJ), 18 (1). pp. 41-58. ISSN 1985-3807 (2016)

Development plan

Malaysian development plan system: issues and problems, one decade after its reform (2001-2011). PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, XI. pp. 1-20. ISSN 0128-0945 (2013)

Digital economy

Join us in developing state’s digital economy, says CM. [Newspaper] (2020)

Digitalisasi industri pembinaan

Kementerian Kerja Raya ke arah digitalisasi industri pembinaan. [Newspaper] (2019)

Dispute resolution

Assessing the Malaysian standard form of contract in relation to the current construction dispute and dispute resolution. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 13. pp. 151-161. ISSN 2590-4140 (2020)

Doctrine of privity

Critical analysis of “doctrine of privity” in Malaysian construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 9. pp. 103-113. ISSN 2590-4140 (2020)

Drainage

Flood hazard mapping in Perlis, using [GIS] and analytical hierarchy process [AHP]. Degree thesis, Universiti Teknologi MARA Cawangan Perlis. (2018)

EIA

An overview of the challenges in Malaysian green construction. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)

Economic influence

Competitive strategy and performance of quantity surveying firms in Malaysia. Journal of Construction in Developing Countries, 19 (2). pp. 15-32. ISSN 2180-4222 (2014)

Economic life

Nang Rindok: bajet 2017- perumahan di Sarawak. [Video] (2016)

PropertyGuru reaches out to developers with TechCare. [Newspaper] (2020)

Arkitek tak semesti bina bangunan besar. Berita Harian. (2019)

Effects of Covid-19 on local property market. [Newspaper] (2020)

Architects want act reviewed encourage local participation. [Newspaper] (2020)

‘Weak property market until economy perks up’. [Newspaper] (2020)

Join us in developing state’s digital economy, says CM. [Newspaper] (2020)

Economy

Most property developers to report weaker sales in 2019. [Newspaper] (2020)

‘Weak property market until economy perks up’. [Newspaper] (2020)

Economy life

Architects urged to design exciting eco-tourism buildings in Sabah. [Newspaper] (2018)

Employee Well-Being

Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)

Energy usage

Building Information Modelling (BIM) in building life cycle. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, Perak, pp. 434-439. ISBN 978-967-5741-67-8 (2018)

Enterprise risk management (ERM)

Conceptualising risk culture on Enterprise Risk Management (ERM) implementation in construction companies. Built Environment Journal, 17 (1): 5. pp. 58-69. ISSN 1675-5022 (2020)

Environment

A study on environmental impact from construction operation in residential areas. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 603-608. ISBN 978-967-5741-67-8 (2018)

Engaging people through lifestyle architecture. [Newspaper] (2020)

Environmental Quality Act 1974

Effects of the environmental, occupational safety and health regulations towards the successful completion of a project. Degree thesis, Universiti Teknologi MARA, Cawangan Pulau Pinang. (2007)

Environmental sustainability

Empirical Research Approach Of Construction Waste Quantification And Standard Tolerance For Stratified Residential Building Projects. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 47-64. ISSN 0128-326X (2017)

Extension of time

Ambiguity extension of time provisions in standard forms of contract: an analysis of PAM 2018 contract. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 18. pp. 208-227. ISSN 2590-4140 (2020)

Extension of time and performance

Performance of contractor: project delay. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 52-56. ISBN 978-967-5741-67-8 (2018)

Factors

Exploration of cause contributing defect at high-rise residential building in Klang Valley: a literature review. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 103-108. ISBN 978-967-5741-67-8 (2018)

Factors Influence

Managing factors influence defects on Industrialized Building System (IBS) components towards sustainability construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 177-183. ISBN 978-967-5741-67-8 (2018)

Fakulti Rekabentuk dan Senibina

Kesan ruang tidak kondusif. [Newspaper] (2020)

Feasibility

A Feasibility Study on Rainwater Harvesting System for Mosque in Perak Tengah. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Field work

Kontraktor O&G jutawan berusia 33 tahun. [Newspaper] (2017)

Kontraktor bumiputera perlu berani rebut peluang projek - PKMM. [Newspaper] (2018)

Finance

SME Go. [Website]

Fire safety management

Fire safety policy and procedure at government hospital: case study Hospital Raja Perempuan Zainab II. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 196-201. ISBN 978-967-5741-67-8 (2018)

Firm competitiveness

Competitive strategy and performance of quantity surveying firms in Malaysia. Journal of Construction in Developing Countries, 19 (2). pp. 15-32. ISSN 2180-4222 (2014)

Flood

Flood hazard mapping in Perlis, using [GIS] and analytical hierarchy process [AHP]. Degree thesis, Universiti Teknologi MARA Cawangan Perlis. (2018)

Foamed concrete

An innovative Structural Insulated Panel (SIP): evaluation of durability properties and structural performance. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 456-461. ISBN 978-967-5741-67-8 (2018)

Foreign architects

Architects want act reviewed encourage local participation. [Newspaper] (2020)

GIS

Flood hazard mapping in Perlis, using [GIS] and analytical hierarchy process [AHP]. Degree thesis, Universiti Teknologi MARA Cawangan Perlis. (2018)

Gantt chart

Construction planning for the success of projects: a case study. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 412-419. ISBN 978-967-5741-67-8 (2018)

Garis panduan

UNSPECIFIED, ed. Garis panduan keselamatan dan kesihatan pekerjaan industri pembinaan (pengurusan) 2020. Jabatan Keselamatan Dan Kesihatan Pekerjaan, Putrajaya, Malaysia. ISBN 978-967-16706-7-5 (2020)

Gazebo

Serambi Villa kediaman impian tepi tasik. [Newspaper] (2021)

Governance

Client governing success criteria in Building Information Modelling (BIM)-based projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 64-76. ISSN 2180-3242 (2020)

Green Building Index (GBI)

An overview of the challenges in Malaysian green construction. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)

Green Construction

Project manager success factors in managing green buildings in Malaysia: knowledge and skills. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)

An overview of the challenges in Malaysian green construction. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)

Green Technology

A Feasibility Study on Rainwater Harvesting System for Mosque in Perak Tengah. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Green approach

Green approach in road construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 102-107. ISBN 978-967-5741-67-8 (2015)

Green architecture

Green approach in road construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 102-107. ISBN 978-967-5741-67-8 (2015)

Towards implementation of green technology in Sabah construction industry. Materials Science and Engineering, 291. ISSN 1757-899X (2017)

Green construction

Collaboration initiative on green construction and sustainability through Industrialized Buildings Systems(IBS) in the Malaysian construction industry. International Journal of Sustainable Construction Engineering & Technology, 1 (1). pp. 119-127. ISSN 2180-3242 (2010)

Green roof

Analytical review of maintenance criteria for green roof in Malaysia. Malaysian Journal of Sustainable Environment (MySE), 3 (2): 2. pp. 31-45. ISSN 0128-326X (2017)

Green technology

Towards implementation of green technology in Sabah construction industry. Materials Science and Engineering, 291. ISSN 1757-899X (2017)

Gross Domestic Product (GDP)

Construction sector can power us towards high-income nation. [Newspaper] (2021)

Haily

Haily sasar hasil IPO RM20.4 juta. [Newspaper] (2021)

Hazard

A study of road hazardsfaced by Malaysian school children using HIRARC. Malaysian Journal of Public Health Medicine, 18 (2). pp. 10-17. ISSN 2590-3829 (2018)

Hazard identification

A study of road hazardsfaced by Malaysian school children using HIRARC. Malaysian Journal of Public Health Medicine, 18 (2). pp. 10-17. ISSN 2590-3829 (2018)

Health

UNSPECIFIED, ed. Best practices on occupational safety and health in construction industry 2019. Department of Occupational Safety and Health, Putrajaya, Malaysia. ISBN 978-967-16706-2-0 (2019)

Heritage building conservation

Heritage building information modelling: the rise of quantity surveyors. Berita QS, Iss. 1, 2018/2019, 1. pp. 21-26. (Unpublished) (2018)

Heritage project

Risk cost analysis in Malay heritage conservation project. Journal of the Malaysian Institute of Planners, 18 (2): 5. pp. 59-72. ISSN 1675-6215 (2020)

High rise building

Implications and strategies of safety management in high rise building construction to contractor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 7-12. ISBN 978-967-5741-67-8 (2018)

Higher dimension knowledge

A conceptual framework for managing higher dimension knowledge in BIM environment. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 20. pp. 237-248. ISSN 2590-4140 (2020)

Highland

Challenges and control mechanism for development on highland and steep slope: the case of Klang Valley. Malaysian Construction Research Journal (MCRJ), 18 (1). pp. 41-58. ISSN 1985-3807 (2016)

Hillside development project

The implementation of risk management plan: towards safer hillside development project. Malaysian Construction Research Journal (MCRJ): International Conference on Applied Science and Technology (ICAST) 2017, 3 (1): 1. pp. 1-9. ISSN 1985-3807 (2018)

Hilly Area

The implementation of risk management plan: towards safer hillside development project. Malaysian Construction Research Journal (MCRJ): International Conference on Applied Science and Technology (ICAST) 2017, 3 (1): 1. pp. 1-9. ISSN 1985-3807 (2018)

Historic Building Information Modelling

Historic Building Information Modelling (HBIM) for Malaysian construction industry. PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, 16 (3): 28. pp. 332-343. ISSN 0128-0945 (2018)

Holdings

Pencakar Langit. [Newspaper] (2017)

Housing

Constraints in implementing qlassic for stratified housing. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 171-176. ISBN 978-967-5741-67-8 (2018)

Sustainable housing affordability in Sabah. Journal of the Malaysian Institute of Planners, 5: 1. pp. 65-76. ISSN 1675-6215 (2016)

Housing quality

Addressing issues on quality in low-cost house construction in Selangor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 32-37. ISBN 978-967-5741-67-8 (2018)

IBS

Peralihan teknologi pembinaan era COVID-19. [Newspaper] (2020)

IR 4.0

Pertingkat aspek OSH selaras tuntutan IR4.0. [Newspaper] (2020)

Implementation

Towards implementation of green technology in Sabah construction industry. Materials Science and Engineering, 291. ISSN 1757-899X (2017)

Implementation and management

Building Information Modelling (BIM) in building life cycle. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, Perak, pp. 434-439. ISBN 978-967-5741-67-8 (2018)

Industrialised Building System (IBS)

Managing factors influence defects on Industrialized Building System (IBS) components towards sustainability construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 177-183. ISBN 978-967-5741-67-8 (2018)

Industrialised building system (IBS)

Projek sistem binaan berindustri – hasil inovasi 5 pensyarah PSMZA. [Video] (2019)

Industrialized Building System (IBS)

Collaboration initiative on green construction and sustainability through Industrialized Buildings Systems(IBS) in the Malaysian construction industry. International Journal of Sustainable Construction Engineering & Technology, 1 (1). pp. 119-127. ISSN 2180-3242 (2010)

Industry Requirement

Construction management graduates roles and tasks portfolio: analysing using rasch measurement model. Malaysian Construction Research Journal (MCRJ): International Conference on Applied Science and Technology (ICAST) 2017, 3 (1). pp. 18-24. ISSN 2590-4140 (2018)

Information Technology

Industrial Revolution 4.0 can help boost construction industry. [Newspaper] (2020)

Information technology infrastructure

Project performance framework: the role of knowledge management and information technology infrastructure. Asian Journal of Business and Accounting, 1 (2). pp. 39-64. ISSN 1985-4064 (2008)

Innovation

Kementerian Kerja Raya ke arah digitalisasi industri pembinaan. [Newspaper] (2019)

Insentif

SME Go. [Website]

Integrity

Isu integriti dalam pelaksanaan projek-projek kerajaan daripada perspektif Jabatan Audit Negara. In: Program Transformasi Kepimpinan Juruukur/Jurugeospatial JUPEM Tahun 2020, 1 & 2 Februari 2020, Institut Tanah dan Ukur Negara (INSTUN). (Unpublished) (2020)

Intelligent Systems

Industrial Revolution 4.0 can help boost construction industry. [Newspaper] (2020)

Interior design

Key factors of BIM implementation for interior design firms in Malaysia. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 175-184. ISSN 2180-3242 (2020)

Internet of Things (IoT)

Industrial Revolution 4.0 can help boost construction industry. [Newspaper] (2020)

Jaringan Pengangkutan Awam

Projek dalam fasa 'bersedia'. [Newspaper] (2020)

Kaedah komunikasi

Pengurusan projek pembinaan: kaedah dan keberkesanan komunikasi di tapak bina. In: Management in Construction Research Conference (MICRA), June 2009, USM, Penang. (2009)

Kawasan strategik

Merdeka 118 dilengkapi pelbagai keistimewaan. [Newspaper] (2021)

Kebajikan

UNSPECIFIED, ed. Garis panduan keselamatan dan kesihatan pekerjaan industri pembinaan (pengurusan) 2020. Jabatan Keselamatan Dan Kesihatan Pekerjaan, Putrajaya, Malaysia. ISBN 978-967-16706-7-5 (2020)

Keberkesanan komunikasi

Pengurusan projek pembinaan: kaedah dan keberkesanan komunikasi di tapak bina. In: Management in Construction Research Conference (MICRA), June 2009, USM, Penang. (2009)

Kejuruteraan Kos

Kejuruteraan kos melestari kewangan, pembangunan. [Newspaper] (2020)

Kejurute­raan awam

Haily sasar hasil IPO RM20.4 juta. [Newspaper] (2021)

Kepakaran pembinaan

Pasukan petugas diwujudkan selesai projek perumahan sakit - KPKT. [Newspaper] (2022)

Kesan alam sekitar

Henti amalan bina bangunan tanpa kelulusan PBT. [Newspaper] (2022)

Keselamatan

UNSPECIFIED, ed. Garis panduan keselamatan dan kesihatan pekerjaan industri pembinaan (pengurusan) 2020. Jabatan Keselamatan Dan Kesihatan Pekerjaan, Putrajaya, Malaysia. ISBN 978-967-16706-7-5 (2020)

Keselamatan awam

Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)

Keselamatan pekerja

Bekerja dalam cuaca buruk, majikan boleh diambil tindakan. [Newspaper] (2022)

Kesihatan

UNSPECIFIED, ed. Garis panduan keselamatan dan kesihatan pekerjaan industri pembinaan (pengurusan) 2020. Jabatan Keselamatan Dan Kesihatan Pekerjaan, Putrajaya, Malaysia. ISBN 978-967-16706-7-5 (2020)

Kesihatan pekerjaan

Bekerja dalam cuaca buruk, majikan boleh diambil tindakan. [Newspaper] (2022)

Key factors

Key factors of BIM implementation for interior design firms in Malaysia. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 175-184. ISSN 2180-3242 (2020)

Knowledge

Project manager success factors in managing green buildings in Malaysia: knowledge and skills. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)

Knowledge management

Project performance framework: the role of knowledge management and information technology infrastructure. Asian Journal of Business and Accounting, 1 (2). pp. 39-64. ISSN 1985-4064 (2008)

Komunikasi

Pengurusan projek pembinaan: kaedah dan keberkesanan komunikasi di tapak bina. In: Management in Construction Research Conference (MICRA), June 2009, USM, Penang. (2009)

Kontraktor kelas A

Kontraktor O&G jutawan berusia 33 tahun. [Newspaper] (2017)

Kos pembinaan

Kos bahan binaan bangunan meningkat. [Newspaper] (2022)

Kualiti binaan

LBS dinobat 10 pemaju terbaik. [Newspaper] (2021)

Labour force

Rancangan Do-iT: potensi kerjaya industri binaan ABM. [Video] (2018)

Landscape

Jom terokai monumen bersejarah di negara kita. [Newspaper] (2020)

This East Malaysian house showcases beauty in the ordinary. [Newspaper] (2020)

Late payments

Late and non-payments issues in the Malaysian construction industry: perspective of building material suppliers. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 39-56. ISSN 0128-326X

Legal

Designers approach in managing legal design risks in Malaysia. Built Environment Journal (BEJ), 12 (1): 5. pp. 34-49. ISSN 1675-5022 (2015)

Legislation

Fire safety policy and procedure at government hospital: case study Hospital Raja Perempuan Zainab II. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 196-201. ISBN 978-967-5741-67-8 (2018)

Liability

Liabilities of designer towards variation cost in commercial buildings in Kuching, Sarawak. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 276-284. ISBN 978-967-5741-67-8 (2018)

Kejuruteraan kos melestari kewangan, pembangunan. [Newspaper] (2020)

Liberalization

A study on the readiness of Malaysian contractors towards trade liberalization. Malaysian Construction Research Journal (MCRJ), 18 (1): 1. pp. 1-27. ISSN 1985-3807 (2016)

Lifestyle architecture

Engaging people through lifestyle architecture. [Newspaper] (2020)

Location of Bodily Injury

Accident cost ratio of bodily injury in railway construction projects. Malaysian Journal of Sustainable Environment (MySE), 5 (2). pp. 81-96. ISSN 0128-326X (2018)

Low Cost Flats

Flat Layout Affecting Social Interaction. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Low cost house

Addressing issues on quality in low-cost house construction in Selangor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 32-37. ISBN 978-967-5741-67-8 (2018)

Low-carbon blueprint

Groundwork to build a smart city. [Newspaper] (2020)

Magnesium oxide

An innovative Structural Insulated Panel (SIP): evaluation of durability properties and structural performance. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 456-461. ISBN 978-967-5741-67-8 (2018)

Maintenance

Analytical review of maintenance criteria for green roof in Malaysia. Malaysian Journal of Sustainable Environment (MySE), 3 (2): 2. pp. 31-45. ISSN 0128-326X (2017)

Malay House

Properties of traditional clay roof tiles manufacture in Kelantan, Peninsular Malaysia. Built Environment Journal (BEJ, 11 (2): 2. pp. 17-34. ISSN 1675-5022 (2014)

Malay settlement

The orientation setting of buildings in the traditional Malay settlement: a case study of Kg Seri Tanjung, Sungai Udang, Melaka. Journal of the Malaysian Institute of Planners, 18 (2): 15. pp. 170-180. ISSN 1675-6215 (2020)

Malaysia

Client governing success criteria in Building Information Modelling (BIM)-based projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 64-76. ISSN 2180-3242 (2020)

Collaboration initiative on green construction and sustainability through Industrialized Buildings Systems(IBS) in the Malaysian construction industry. International Journal of Sustainable Construction Engineering & Technology, 1 (1). pp. 119-127. ISSN 2180-3242 (2010)

Malaysia bus crash

STAMP-Based analysis on the safety management system of bus operators. Journal of the Society of Automotive Engineers Malaysia, 3 (4). pp. 76-84. ISSN 2600-8092 (2019)

Malaysian Construction Industry

Construction management graduates roles and tasks portfolio: analysing using rasch measurement model. Malaysian Construction Research Journal (MCRJ): International Conference on Applied Science and Technology (ICAST) 2017, 3 (1). pp. 18-24. ISSN 2590-4140 (2018)

Malaysian construction

Competitive strategy and performance of quantity surveying firms in Malaysia. Journal of Construction in Developing Countries, 19 (2). pp. 15-32. ISSN 2180-4222 (2014)

Malaysian construction project

Developing a holistic project time management framework utilizing fundamental Supply Chain Management (SCM) tools to overcome delay in Malaysian public sector building projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 31-41. ISSN 2180-3242 (2020)

Malaysian standard form of contract

Assessing the Malaysian standard form of contract in relation to the current construction dispute and dispute resolution. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 13. pp. 151-161. ISSN 2590-4140 (2020)

Management

Case studies on the safety management at construction site. Journal of Sustainability Science and Management, 9 (2): 8. pp. 90-108. ISSN 1823-8556 (2014)

Marketability factor

Most property developers to report weaker sales in 2019. [Newspaper] (2020)

Masjid

Perkampungan al-Quran di Putrajaya. [Newspaper] (2020)

Material

Masjid kampung Belimbing Dalam mungkin antara tertua di Malaysia. [Newspaper] (2020)

Material Culture

Built form properties as sign and symbols of patron political ideology. Jurnal Kejuruteraan, 29 (2). pp. 87-96. ISSN 0128-0198 (2017)

Materials suppliers

Late and non-payments issues in the Malaysian construction industry: perspective of building material suppliers. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 39-56. ISSN 0128-326X

Measurement of building

Malaysian Standard Method of measurement of building works. Manual. The Institutions of Surveyors, Petaling Jaya. (Unpublished) (2000)

Mega projects

An exploratory study: building information modelling execution plan (BEP) procedure in mega construction projects. Malaysian Construction Research Journal (MCRJ), 18 (1): 2. pp. 29-40. ISSN 1985-3807 (2016)

Menara Merdeka 118

Merdeka 118 dilengkapi pelbagai keistimewaan. [Newspaper] (2021)

Mercu tanda

Merdeka 118 dilengkapi pelbagai keistimewaan. [Newspaper] (2021)

Mitigation

Flood hazard mapping in Perlis, using [GIS] and analytical hierarchy process [AHP]. Degree thesis, Universiti Teknologi MARA Cawangan Perlis. (2018)

OSH ICOP

STAMP-Based analysis on the safety management system of bus operators. Journal of the Society of Automotive Engineers Malaysia, 3 (4). pp. 76-84. ISSN 2600-8092 (2019)

OSHA

AWANI Pagi: isu keselamatan & kesihatan di tempat kerja. [Video] (2019)

Bekerja dalam cuaca buruk, majikan boleh diambil tindakan. [Newspaper] (2022)

Keselamatan tapak pembinaan: Zahrim Osman. [Video] (2014)

New concept to prevent workplace accidents, diseases. [Newspaper] (2019)

SPM 2017: keselamatan dan kesihatan pekerjaan kebangsaan. [Video] (2017)

Factory fined RM30k for unsafe worksite that resulted in visitor’s death. [Newspaper] (2020)

Construction related deaths and injuries alarming. [Newspaper] (2020)

Pertingkat aspek OSH selaras tuntutan IR4.0. [Newspaper] (2020)

Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)

Occupational

UNSPECIFIED, ed. Best practices on occupational safety and health in construction industry 2019. Department of Occupational Safety and Health, Putrajaya, Malaysia. ISBN 978-967-16706-2-0 (2019)

Online sales platforms

PropertyGuru reaches out to developers with TechCare. [Newspaper] (2020)

Opinion of value

Pencakar Langit. [Newspaper] (2017)

Kejuruteraan kos melestari kewangan, pembangunan. [Newspaper] (2020)

Organisasi projek

Pengurusan projek (project management). In: Mesyuarat Pemantapan Urusan Pentadbiran Kontrak Kerja Bersama Pegawai Penguasa Projek, February 2020, Melaka, Malaysia. (Submitted) (2020)

Orientation pattern

The orientation setting of buildings in the traditional Malay settlement: a case study of Kg Seri Tanjung, Sungai Udang, Melaka. Journal of the Malaysian Institute of Planners, 18 (2): 15. pp. 170-180. ISSN 1675-6215 (2020)

Outdoor Spaces

Flat Layout Affecting Social Interaction. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

PPE

Compliance with the use of personal protective equipment (PPE) on construction sites in Johor, Malaysia. International Journal of Real Estate Studies, 14 (1): 12. pp. 123-138. ISSN 1823-8505 (2020)

Partnering

Partnering for small-sized contractors in Malaysia. Malaysian Construction Research Journal (MCRJ), 18 (1): 4. pp. 59-69. ISSN 1985-3807 (2016)

Pasang siap

Kajian terhadap kriteria rekabentuk blok saling kunci dengan pendekatan perindustrian, fleksibel dan nyah-pasang. Jurnal Kejuruteraan, 30 (1). pp. 55-63. ISSN 0128-0198 (2018)

Pasaran ACE Bursa Malaysia

Haily sasar hasil IPO RM20.4 juta. [Newspaper] (2021)

Pelan Landskap

UNSPECIFIED, ed. Reka Bentuk bandar Selamat: Panduan Pelaksanaan. Unit Khas NKRA Bandar Selamat, Kuala Lumpur. ISBN 9789675456176 (2010)

Pemandangan tropika

Serambi Villa kediaman impian tepi tasik. [Newspaper] (2021)

Pembangunan berdaya tahan iklim

Henti amalan bina bangunan tanpa kelulusan PBT. [Newspaper] (2022)

Pembangunan hotel

Kekal ciri menarik dan bersejarah di Bukit Fraser. [Newspaper] (2021)

Pembinaan

UNSPECIFIED, ed. Garis panduan keselamatan dan kesihatan pekerjaan industri pembinaan (pengurusan) 2020. Jabatan Keselamatan Dan Kesihatan Pekerjaan, Putrajaya, Malaysia. ISBN 978-967-16706-7-5 (2020)

Pembinaan masjid

Menjejak keunikan seni bina masjid di Melaka. [Newspaper] (2021)

Pengurusan

Pengurusan projek pembinaan: kaedah dan keberkesanan komunikasi di tapak bina. In: Management in Construction Research Conference (MICRA), June 2009, USM, Penang. (2009)

Pengurusan projek

Pengurusan projek (project management). In: Mesyuarat Pemantapan Urusan Pentadbiran Kontrak Kerja Bersama Pegawai Penguasa Projek, February 2020, Melaka, Malaysia. (Submitted) (2020)

Pentadbiran sumber manusia

Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)

Penyesuaian iklim

Henti amalan bina bangunan tanpa kelulusan PBT. [Newspaper] (2022)

Perabot

Perabot asrama antivandalisme. [Newspaper] (2019)

Perancangan Bandar dan Wilayah

Projek dalam fasa 'bersedia'. [Newspaper] (2020)

Perkampungan al-quran

Perkampungan al-Quran di Putrajaya. [Newspaper] (2020)

Perlaksanaan

Pengurusan projek (project management). In: Mesyuarat Pemantapan Urusan Pentadbiran Kontrak Kerja Bersama Pegawai Penguasa Projek, February 2020, Melaka, Malaysia. (Submitted) (2020)

Persatuan Arkitek Perunding Malaysia (ACAM)

Henti amalan bina bangunan tanpa kelulusan PBT. [Newspaper] (2022)

Persekitaran pekerjaan

Bekerja dalam cuaca buruk, majikan boleh diambil tindakan. [Newspaper] (2022)

Perumahan lestari

LBS dinobat 10 pemaju terbaik. [Newspaper] (2021)

Place of work

Hanya 100 pantau 14,000 tapak projek. [Newspaper] (2019)

Planning

Construction planning for the success of projects: a case study. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 412-419. ISBN 978-967-5741-67-8 (2018)

Planning reform

Malaysian development plan system: issues and problems, one decade after its reform (2001-2011). PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, XI. pp. 1-20. ISSN 0128-0945 (2013)

Planning system

Malaysian development plan system: issues and problems, one decade after its reform (2001-2011). PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, XI. pp. 1-20. ISSN 0128-0945 (2013)

Planning tools

Construction planning for the success of projects: a case study. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 412-419. ISBN 978-967-5741-67-8 (2018)

Policy and procedure

Fire safety policy and procedure at government hospital: case study Hospital Raja Perempuan Zainab II. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 196-201. ISBN 978-967-5741-67-8 (2018)

Politics and Architecture

Built form properties as sign and symbols of patron political ideology. Jurnal Kejuruteraan, 29 (2). pp. 87-96. ISSN 0128-0198 (2017)

Process

Sustainable procurement in construction – the way forward for malaysia. Jurnal Jabatan Kerja Raya Malaysia. pp. 21-28. (2013)

Profession

Rancangan Do-iT: potensi kerjaya industri binaan ABM. [Video] (2018)

Professional architect

Suruhanjaya Juru Ukur Bahan perlu memperkukuh kemahiran pembinaan utama. [Video] (2018)

Profitability

Most property developers to report weaker sales in 2019. [Newspaper] (2020)

Project

Mempercepatkan pelaksanaan projek pembangunan RMK9. In: Mesyuarat Majlis Tindakan Negara Bil 1/2009, 25 Jun 2009, Putrajaya. (Unpublished) (2009)

Isu integriti dalam pelaksanaan projek-projek kerajaan daripada perspektif Jabatan Audit Negara. In: Program Transformasi Kepimpinan Juruukur/Jurugeospatial JUPEM Tahun 2020, 1 & 2 Februari 2020, Institut Tanah dan Ukur Negara (INSTUN). (Unpublished) (2020)

Project Management

HIRARC: a tool of safety improvement in the construction industry. In: 2nd INTERNATIONAL CONFERENCE ON BUILT ENVIRONMENT IN DEVELOPING COUNTRIES (ICBEDC 2008), 3rd - 4th December, 2008, Universiti Sains Malaysia, Penang, Malaysia. (Submitted) (2008)

Project Manager

Project manager success factors in managing green buildings in Malaysia: knowledge and skills. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)

Project contract

Kontraktor bumiputera perlu berani rebut peluang projek - PKMM. [Newspaper] (2018)

Project performance

Impact of design changes in construction project. Malaysian Journal of Sustainable Environment (MySE), 4 (1). pp. 1-18. ISSN 0128-326X (2018)

Projek

Pengurusan projek pembinaan: kaedah dan keberkesanan komunikasi di tapak bina. In: Management in Construction Research Conference (MICRA), June 2009, USM, Penang. (2009)

Projek bermasalah

Pasukan petugas diwujudkan selesai projek perumahan sakit - KPKT. [Newspaper] (2022)

Projek perumahan

Pasukan petugas diwujudkan selesai projek perumahan sakit - KPKT. [Newspaper] (2022)

Property

‘Weak property market until economy perks up’. [Newspaper] (2020)

Property Development

Nang Rindok: bajet 2017- perumahan di Sarawak. [Video] (2016)

Most property developers to report weaker sales in 2019. [Newspaper] (2020)

Property developers and agents

PropertyGuru reaches out to developers with TechCare. [Newspaper] (2020)

Property management

Effects of Covid-19 on local property market. [Newspaper] (2020)

Putrajaya

Perkampungan al-Quran di Putrajaya. [Newspaper] (2020)

QLASSIC

Constraints in implementing qlassic for stratified housing. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 171-176. ISBN 978-967-5741-67-8 (2018)

Quality

Addressing issues on quality in low-cost house construction in Selangor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 32-37. ISBN 978-967-5741-67-8 (2018)

Factors affecting quality in Construction Project Life Cycle (CPLC). The International Journal of Integrated Engineering, 14 (1). pp. 322-355. ISSN 2229-838X (2022)

Quality Improvement

The Readiness of Building Information Modeling (BIM) Application in Quantity Surveying Firm for Quality Improvement. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Quality performance

Constraints in implementing qlassic for stratified housing. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 171-176. ISBN 978-967-5741-67-8 (2018)

Quantity Surveying Firm

The Readiness of Building Information Modeling (BIM) Application in Quantity Surveying Firm for Quality Improvement. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Quantity surveying

MyCESMM seragamkan kaedah ukur bahan. [Video] (2015)

Quantity surveying firms

Competitive strategy and performance of quantity surveying firms in Malaysia. Journal of Construction in Developing Countries, 19 (2). pp. 15-32. ISSN 2180-4222 (2014)

Railway Construction Project

Accident cost ratio of bodily injury in railway construction projects. Malaysian Journal of Sustainable Environment (MySE), 5 (2). pp. 81-96. ISSN 0128-326X (2018)

Rainwater Harvesting (RWH)

Rainwater Harvesting (RWH) installation for buildings: a systematic review and meta-analysis approach. Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 89-108. ISSN 0128-326X (2019)

Rainwater Harvesting System

A Feasibility Study on Rainwater Harvesting System for Mosque in Perak Tengah. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Rasch Measurement Model

Construction management graduates roles and tasks portfolio: analysing using rasch measurement model. Malaysian Construction Research Journal (MCRJ): International Conference on Applied Science and Technology (ICAST) 2017, 3 (1). pp. 18-24. ISSN 2590-4140 (2018)

Readiness

Green approach in road construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 102-107. ISBN 978-967-5741-67-8 (2015)

Real Estate

Effects of Covid-19 on local property market. [Newspaper] (2020)

Real property

Nang Rindok: bajet 2017- perumahan di Sarawak. [Video] (2016)

Recycle concrete waste aggregate

Mechanical properties of reinforced concrete beam with recycled coarse aggregates. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 106-115. ISSN 0128-326X (2017)

Recycled Concrete Aggregate

Recycled Concrete Aggregate for IBS Component. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Recycling

Recycled Concrete Aggregate for IBS Component. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Reinforced concrete beam

Mechanical properties of reinforced concrete beam with recycled coarse aggregates. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 106-115. ISSN 0128-326X (2017)

Reka bentuk projek

Pengurusan projek (project management). In: Mesyuarat Pemantapan Urusan Pentadbiran Kontrak Kerja Bersama Pegawai Penguasa Projek, February 2020, Melaka, Malaysia. (Submitted) (2020)

Rekabentuk

Perabot asrama antivandalisme. [Newspaper] (2019)

Rekabentuk blok

Kajian terhadap kriteria rekabentuk blok saling kunci dengan pendekatan perindustrian, fleksibel dan nyah-pasang. Jurnal Kejuruteraan, 30 (1). pp. 55-63. ISSN 0128-0198 (2018)

Religion Building

A Feasibility Study on Rainwater Harvesting System for Mosque in Perak Tengah. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Residential

A study on environmental impact from construction operation in residential areas. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 603-608. ISBN 978-967-5741-67-8 (2018)

Residential projects

Control of variation orders in the construction of residential projects in Malaysia. Journal of the Malaysian Institute of Planners, 20 (2). pp. 14-21. ISSN 1675-6215 (2022)

Risk analysis

Technology awareness of artificial intelligence (AI) application for risk analysis in construction projects. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 16. pp. 182-195. ISSN 2590-4140 (2020)

A study of road hazardsfaced by Malaysian school children using HIRARC. Malaysian Journal of Public Health Medicine, 18 (2). pp. 10-17. ISSN 2590-3829 (2018)

Risk culture

Conceptualising risk culture on Enterprise Risk Management (ERM) implementation in construction companies. Built Environment Journal, 17 (1): 5. pp. 58-69. ISSN 1675-5022 (2020)

Risk management

Designers approach in managing legal design risks in Malaysia. Built Environment Journal (BEJ), 12 (1): 5. pp. 34-49. ISSN 1675-5022 (2015)

Risk management plan

The implementation of risk management plan: towards safer hillside development project. Malaysian Construction Research Journal (MCRJ): International Conference on Applied Science and Technology (ICAST) 2017, 3 (1): 1. pp. 1-9. ISSN 1985-3807 (2018)

Risk taking

Risk cost analysis in Malay heritage conservation project. Journal of the Malaysian Institute of Planners, 18 (2): 5. pp. 59-72. ISSN 1675-6215 (2020)

Road problems

Lubang tiba-tiba di bandar Mentakab. [Newspaper] (2021)

Road safety

STAMP-Based analysis on the safety management system of bus operators. Journal of the Society of Automotive Engineers Malaysia, 3 (4). pp. 76-84. ISSN 2600-8092 (2019)

Road transport

A study of road hazardsfaced by Malaysian school children using HIRARC. Malaysian Journal of Public Health Medicine, 18 (2). pp. 10-17. ISSN 2590-3829 (2018)

Roles of safety officer

Space management’s regarding safety level at construction site. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 25-31. ISBN 978-967-5741-67-8 (2018)

Roofing

Properties of traditional clay roof tiles manufacture in Kelantan, Peninsular Malaysia. Built Environment Journal (BEJ, 11 (2): 2. pp. 17-34. ISSN 1675-5022 (2014)

Roofing tiles

Singgora tiles: perception of the community in Kota Bharu, Kelantan. Built Environment Journal (BEJ), 12 (1): 2. pp. 11-17. ISSN 1675-5022 (2015)

SOP

Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)

STAMP

STAMP-Based analysis on the safety management system of bus operators. Journal of the Society of Automotive Engineers Malaysia, 3 (4). pp. 76-84. ISSN 2600-8092 (2019)

Safety

AWANI Pagi: isu keselamatan & kesihatan di tempat kerja. [Video] (2019)

UNSPECIFIED, ed. Best practices on occupational safety and health in construction industry 2019. Department of Occupational Safety and Health, Putrajaya, Malaysia. ISBN 978-967-16706-2-0 (2019)

Guidelines on Occupational Safety and Health in Construction Industry (Management) 2017. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan, Kuala Lumpur. (2017)

Guidelines on occupational safety and health in tunnel construction. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan, Kuala Lumpur. (1998)

Guidelines on trenching for construction safety. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan. (2000)

Keselamatan tapak pembinaan: Zahrim Osman. [Video] (2014)

SOP PKP pemulihan - sektor pembinaan. [Phamplet] (Unpublished)

SPM 2017: keselamatan dan kesihatan pekerjaan kebangsaan. [Video] (2017)

Ucapan aluan Yang Berbahagia Datuk Ir. Ahmad ‘Asri Abdul Hamid, Ketua Eksekutif CIDB Malaysia. In: Safety And Health Assessment System In Construction (SHASSIC) Day 2020 dan Majlis Pelancaran Construction Industry Standard 27 (CIS 27:2019), 25 Februari 2020, Pusat Konvensyen CIDB Malaysia. (Unpublished) (2020)

Baiki tahap keselamatan, kesihatan pekerja pembinaan - Lam Thye. [Newspaper] (2020)

A study of road hazardsfaced by Malaysian school children using HIRARC. Malaysian Journal of Public Health Medicine, 18 (2). pp. 10-17. ISSN 2590-3829 (2018)

Safety performance of subcontractors in Malaysian construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 10. pp. 114-125. ISSN 2590-4140 (2020)

Keselamatan, kesihatan di tempat kerja bukan isu remeh. [Newspaper] (2021)

Case studies on the safety management at construction site. Journal of Sustainability Science and Management, 9 (2): 8. pp. 90-108. ISSN 1823-8556 (2014)

Hanya 100 pantau 14,000 tapak projek. [Newspaper] (2019)

Safety Management

HIRARC: a tool of safety improvement in the construction industry. In: 2nd INTERNATIONAL CONFERENCE ON BUILT ENVIRONMENT IN DEVELOPING COUNTRIES (ICBEDC 2008), 3rd - 4th December, 2008, Universiti Sains Malaysia, Penang, Malaysia. (Submitted) (2008)

Safety and health cost

Overview of safety & health cost framework for the construction of rail infrastructure projects. Malaysian Journal of Sustainable Environment (MySE), 2 (1). pp. 101-119. ISSN 0128-326X (2017)

Safety and health factor

Effects of the environmental, occupational safety and health regulations towards the successful completion of a project. Degree thesis, Universiti Teknologi MARA, Cawangan Pulau Pinang. (2007)

Safety hazards

Space management’s regarding safety level at construction site. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 25-31. ISBN 978-967-5741-67-8 (2018)

Safety management

Implications and strategies of safety management in high rise building construction to contractor. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 7-12. ISBN 978-967-5741-67-8 (2018)

Safety requirements

Ensuring safety of our building. [Newspaper] (2021)

Saling kunci

Kajian terhadap kriteria rekabentuk blok saling kunci dengan pendekatan perindustrian, fleksibel dan nyah-pasang. Jurnal Kejuruteraan, 30 (1). pp. 55-63. ISSN 0128-0198 (2018)

Sandwich panel

An innovative Structural Insulated Panel (SIP): evaluation of durability properties and structural performance. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 456-461. ISBN 978-967-5741-67-8 (2018)

Sarawak

Cadangan bina ‘Terminal Makanan Sarawak’. [Newspaper] (2020)

Schedule

Construction planning for the success of projects: a case study. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 412-419. ISBN 978-967-5741-67-8 (2018)

Sektor seni bina

LBS dinobat 10 pemaju terbaik. [Newspaper] (2021)

Seni bina bangunan f

Menjejak keunikan seni bina masjid di Melaka. [Newspaper] (2021)

Seni bina campuran

Kekal ciri menarik dan bersejarah di Bukit Fraser. [Newspaper] (2021)

Senibina

Anugerah warisan kebudayaan 2021. [Newspaper] (2021)

Kesan ruang tidak kondusif. [Newspaper] (2020)

Separuh sfera

Menjejak keunikan seni bina masjid di Melaka. [Newspaper] (2021)

Serambi villa

Serambi Villa kediaman impian tepi tasik. [Newspaper] (2021)

Services costs

Essential features of SMM for M&E works in Malaysia. Berita QS, Iss. 2, 2018/2019, 2. pp. 11-12. (Unpublished) (2019)

Singgora

Properties of traditional clay roof tiles manufacture in Kelantan, Peninsular Malaysia. Built Environment Journal (BEJ, 11 (2): 2. pp. 17-34. ISSN 1675-5022 (2014)

Sistem binaan berindustri

Arahan Penggunaan JKR 20601-0251-18: Specification For Precast Concrete Works. Manual. Jabatan Kerja Raya Malaysia, Kuala Lumpur. (2019)

Site

Case studies on the safety management at construction site. Journal of Sustainability Science and Management, 9 (2): 8. pp. 90-108. ISSN 1823-8556 (2014)

Site planning

Performance of contractor: project delay. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 52-56. ISBN 978-967-5741-67-8 (2018)

Site survey

Hanya 100 pantau 14,000 tapak projek. [Newspaper] (2019)

Skilled workforce

Construction sector can power us towards high-income nation. [Newspaper] (2021)

Skills

Project manager success factors in managing green buildings in Malaysia: knowledge and skills. In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, UiTM Cawangan Perak. (Submitted) (2015)

Skyscraper

Pencakar Langit. [Newspaper] (2017)

Small medium

Partnering for small-sized contractors in Malaysia. Malaysian Construction Research Journal (MCRJ), 18 (1): 4. pp. 59-69. ISSN 1985-3807 (2016)

Smart City

Groundwork to build a smart city. [Newspaper] (2020)

Social engagement

Ucapan aluan Yang Berbahagia Datuk Ir. Ahmad ‘Asri Abdul Hamid, Ketua Eksekutif CIDB Malaysia. In: Safety And Health Assessment System In Construction (SHASSIC) Day 2020 dan Majlis Pelancaran Construction Industry Standard 27 (CIS 27:2019), 25 Februari 2020, Pusat Konvensyen CIDB Malaysia. (Unpublished) (2020)

Social transformation

Arkitek tak semesti bina bangunan besar. Berita Harian. (2019)

Soiling defects

Inhalable and respirable dust concentration of soiled stone, metal and ceramic artefact inside national museum Malaysia. Journal of the Malaysian Institute of Planners, 16 (2): 30. pp. 293-303. ISSN 1675-6215 (2018)

Space management

Space management’s regarding safety level at construction site. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 25-31. ISBN 978-967-5741-67-8 (2018)

Space management at construction site

Space management’s regarding safety level at construction site. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 25-31. ISBN 978-967-5741-67-8 (2018)

Spatial analysis

Flood hazard mapping in Perlis, using [GIS] and analytical hierarchy process [AHP]. Degree thesis, Universiti Teknologi MARA Cawangan Perlis. (2018)

Spatial planning

Malaysian development plan system: issues and problems, one decade after its reform (2001-2011). PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners, XI. pp. 1-20. ISSN 0128-0945 (2013)

Specification

Arahan Penggunaan JKR 20601-0251-18: Specification For Precast Concrete Works. Manual. Jabatan Kerja Raya Malaysia, Kuala Lumpur. (2019)

Stakeholders

An exploratory study: building information modelling execution plan (BEP) procedure in mega construction projects. Malaysian Construction Research Journal (MCRJ), 18 (1): 2. pp. 29-40. ISSN 1985-3807 (2016)

Standard

MyCESMM seragamkan kaedah ukur bahan. [Video] (2015)

Standard Method of Measurement (SMM)

Adopting standardization in construction environment: standard method of measurement (SMMs). Procedia - Social and Behavioral Sciences, 170. pp. 37-48. ISSN 1877-0428 (2015)

Standard form

Ambiguity extension of time provisions in standard forms of contract: an analysis of PAM 2018 contract. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 18. pp. 208-227. ISSN 2590-4140 (2020)

Standard procedure

SOP PKP pemulihan - sektor pembinaan. [Phamplet] (Unpublished)

Standard tolerance

Empirical Research Approach Of Construction Waste Quantification And Standard Tolerance For Stratified Residential Building Projects. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 47-64. ISSN 0128-326X (2017)

Steep Slope

Challenges and control mechanism for development on highland and steep slope: the case of Klang Valley. Malaysian Construction Research Journal (MCRJ), 18 (1). pp. 41-58. ISSN 1985-3807 (2016)

Stratified residential building

Empirical Research Approach Of Construction Waste Quantification And Standard Tolerance For Stratified Residential Building Projects. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 47-64. ISSN 0128-326X (2017)

Structural insulated panel

An innovative Structural Insulated Panel (SIP): evaluation of durability properties and structural performance. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 456-461. ISBN 978-967-5741-67-8 (2018)

Struktur

Perabot asrama antivandalisme. [Newspaper] (2019)

Struktur binaan

Masjid kampung Belimbing Dalam mungkin antara tertua di Malaysia. [Newspaper] (2020)

Struktur haram

Henti amalan bina bangunan tanpa kelulusan PBT. [Newspaper] (2022)

Sub-contractor safety performance

Safety performance of subcontractors in Malaysian construction industry. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 10. pp. 114-125. ISSN 2590-4140 (2020)

Success criteria

Client governing success criteria in Building Information Modelling (BIM)-based projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 64-76. ISSN 2180-3242 (2020)

Superstructure

Pencakar Langit. [Newspaper] (2017)

Supply chain management

Developing a holistic project time management framework utilizing fundamental Supply Chain Management (SCM) tools to overcome delay in Malaysian public sector building projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 31-41. ISSN 2180-3242 (2020)

Sustainability

Collaboration initiative on green construction and sustainability through Industrialized Buildings Systems(IBS) in the Malaysian construction industry. International Journal of Sustainable Construction Engineering & Technology, 1 (1). pp. 119-127. ISSN 2180-3242 (2010)

Sustainability Construction

Managing factors influence defects on Industrialized Building System (IBS) components towards sustainability construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 177-183. ISBN 978-967-5741-67-8 (2018)

Sustainable

Sustainable housing affordability in Sabah. Journal of the Malaysian Institute of Planners, 5: 1. pp. 65-76. ISSN 1675-6215 (2016)

Sustainable Procurement

Sustainable procurement in construction – the way forward for malaysia. Jurnal Jabatan Kerja Raya Malaysia. pp. 21-28. (2013)

Sustainable construction

Green approach in road construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 102-107. ISBN 978-967-5741-67-8 (2015)

Sustainable development

Green approach in road construction. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 102-107. ISBN 978-967-5741-67-8 (2015)

System safety

STAMP-Based analysis on the safety management system of bus operators. Journal of the Society of Automotive Engineers Malaysia, 3 (4). pp. 76-84. ISSN 2600-8092 (2019)

Tapak pembinaan

Bekerja dalam cuaca buruk, majikan boleh diambil tindakan. [Newspaper] (2022)

Baiki tahap keselamatan, kesihatan pekerja pembinaan - Lam Thye. [Newspaper] (2020)

Technology awareness

Technology awareness of artificial intelligence (AI) application for risk analysis in construction projects. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 16. pp. 182-195. ISSN 2590-4140 (2020)

Terminal makanan

Cadangan bina ‘Terminal Makanan Sarawak’. [Newspaper] (2020)

Tile

Properties of traditional clay roof tiles manufacture in Kelantan, Peninsular Malaysia. Built Environment Journal (BEJ, 11 (2): 2. pp. 17-34. ISSN 1675-5022 (2014)

Time and cost time model

Control of variation orders in the construction of residential projects in Malaysia. Journal of the Malaysian Institute of Planners, 20 (2). pp. 14-21. ISSN 1675-6215 (2022)

Time control

Improving cost and time control in construction using Building Information Model (BIM): a review. Pertanika Journal Science & Technology, 26 (1): 2. 21 -36. ISSN 0128-7680 (2018)

Time management,

Developing a holistic project time management framework utilizing fundamental Supply Chain Management (SCM) tools to overcome delay in Malaysian public sector building projects. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 31-41. ISSN 2180-3242 (2020)

Time overrun

Impact of design changes in construction project. Malaysian Journal of Sustainable Environment (MySE), 4 (1). pp. 1-18. ISSN 0128-326X (2018)

Title

PropertyGuru reaches out to developers with TechCare. [Newspaper] (2020)

Architects urged to design exciting eco-tourism buildings in Sabah. [Newspaper] (2018)

Pencakar Langit. [Newspaper] (2017)

Kejuruteraan kos melestari kewangan, pembangunan. [Newspaper] (2020)

Join us in developing state’s digital economy, says CM. [Newspaper] (2020)

Tokong

Anugerah warisan kebudayaan 2021. [Newspaper] (2021)

Town & Regional Planning

Projek dalam fasa 'bersedia'. [Newspaper] (2020)

Town Planning

Groundwork to build a smart city. [Newspaper] (2020)

Town management

Lubang tiba-tiba di bandar Mentakab. [Newspaper] (2021)

Traditional Malay house

Singgora tiles: perception of the community in Kota Bharu, Kelantan. Built Environment Journal (BEJ), 12 (1): 2. pp. 11-17. ISSN 1675-5022 (2015)

Traditional settlement

The orientation setting of buildings in the traditional Malay settlement: a case study of Kg Seri Tanjung, Sungai Udang, Melaka. Journal of the Malaysian Institute of Planners, 18 (2): 15. pp. 170-180. ISSN 1675-6215 (2020)

Transportation

STAMP-Based analysis on the safety management system of bus operators. Journal of the Society of Automotive Engineers Malaysia, 3 (4). pp. 76-84. ISSN 2600-8092 (2019)

Trenches

Guidelines on trenching for construction safety. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan. (2000)

Tunnel construction

Guidelines on occupational safety and health in tunnel construction. Manual. Jabatan Keselamatan dan Kesihatan Pekerjaan, Kuala Lumpur. (1998)

Uniform Building By-Laws (UBBL)

Ensuring safety of our building. [Newspaper] (2021)

Variables

Key factors of BIM implementation for interior design firms in Malaysia. International Journal of Sustainable Construction Engineering and Technology, 11 (1). pp. 175-184. ISSN 2180-3242 (2020)

Variation order

Liabilities of designer towards variation cost in commercial buildings in Kuching, Sarawak. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 276-284. ISBN 978-967-5741-67-8 (2018)

Vegetation

Developing criteria and variables for evaluating the effects of vegetation on single-family houses. Built Environment Journal, 12 (2): 1. pp. 1-11. ISSN 1675-5022 (2015)

Virtual galleries

PropertyGuru reaches out to developers with TechCare. [Newspaper] (2020)

Virtual tours show units

PropertyGuru reaches out to developers with TechCare. [Newspaper] (2020)

Visual Comfort

Influence of Lighting and Colour Usage In Higher Education, a Case Study Of an Architectural Studio. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Waste

Recycled Concrete Aggregate for IBS Component. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

Waste quantification

Empirical Research Approach Of Construction Waste Quantification And Standard Tolerance For Stratified Residential Building Projects. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 47-64. ISSN 0128-326X (2017)

flexural strength

Mechanical properties of reinforced concrete beam with recycled coarse aggregates. Malaysian Journal of Sustainable Environment (MySE), 3 (2). pp. 106-115. ISSN 0128-326X (2017)

human factors

Developing criteria and variables for evaluating the effects of vegetation on single-family houses. Built Environment Journal, 12 (2): 1. pp. 1-11. ISSN 1675-5022 (2015)

incentive

SME Go. [Website]

knowledge sharing

A conceptual framework for managing higher dimension knowledge in BIM environment. Malaysian Construction Research Journal: RISM International Research Conference 2020, 9 (1): 20. pp. 237-248. ISSN 2590-4140 (2020)

lighting

Influence of Lighting and Colour Usage In Higher Education, a Case Study Of an Architectural Studio. In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, UiTM Cawangan Perak. (2018)

single-family houses

Developing criteria and variables for evaluating the effects of vegetation on single-family houses. Built Environment Journal, 12 (2): 1. pp. 1-11. ISSN 1675-5022 (2015)

İndicators

Exploration of cause contributing defect at high-rise residential building in Klang Valley: a literature review. In: 3rd undergraduate seminar built environment & technology. Faculty of Architecture, Planning & Surveying, UiTM Perak, Perak, pp. 103-108. ISBN 978-967-5741-67-8 (2018)

This list was generated on Mon Dec 23 03:22:39 2024 +08.